Download presentation
Presentation is loading. Please wait.
Published byCaroline Bruce Modified over 5 years ago
1
TGn Closing Report Vancouver, BC, Canada 802 Plenary
March 2009March 2009 January 2009 /0412r1doc.: IEEE /0412r0 doc.: IEEE /0107r0 March 2009 March 2009 TGn Closing Report Vancouver, BC, Canada 802 Plenary Date: Authors: Name Company Address Phone 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) Bruce Kraemer Marvell marvell .com Sheung Li SiBEAM 555 Mathilda Ave, Sunnyvale, CA 94085 +1 (408) Adrian Stephens Intel Corporation 15 JJ Thompson +1 (503) intel.com Avenue, Cambridge, CB3 0FD, UK Bruce Kraemer, Marvell Page 1 Bruce Kraemer, Marvell
2
Sponsor Ballot Recirculation #1 on TGn
November 2008 March 2009March 2009 /0412r1doc.: IEEE /0412r0 doc.: IEEE /1252r1 March 2009 Sponsor Ballot Recirculation #1 on TGn Sponsor recirculation ballot closed March 07 and passed with a 80.1% affirmative vote (169 approve, 42 not approve, 17 abstain) 77 comments received During March meeting, All comments resolved, and editor empowered to create TGn Draft 9.0 for further balloting Bruce Kraemer, Marvell Page 2 Bruce Kraemer, Marvell
3
TGn - Primary March Meeting Documents
March 2009March 2009 /0412r1doc.: IEEE /0412r0 doc.: IEEE /0412r0 March 2009 March 2009 TGn - Primary March Meeting Documents SB #1 Comment Composite r5 Meeting Report r10 Editors Report r1 Closing Report r0 Meeting Minutes r0 TGn Draft 8.0 Bruce Kraemer, Marvell Page 3 Bruce Kraemer, Marvell
4
Mar ’09 to May ‘09 TGn Teleconference Plan
March 2009March 2009 /0412r1doc.: IEEE /0412r0 March 2009 Mar ’09 to May ‘09 TGn Teleconference Plan Call time: 11:00 – 13:00 ET Call number: Wednesday Blocking events Ad hoc group Meeting chair Bridge # Passcode Mar 11 Plenary Mar 18 5 Mar 25 W topics Bruce Kraemer Apr 01 Apr 08 Apr 15 Apr 22 Apr 29 May 06 May 13 Interim
5
TGn Timeline is Unchanged
March 2009 March 2009March 2009 /0412r1doc.: IEEE /0412r0 doc.: IEEE /0412r0 March 2009 TGn Timeline is Unchanged Event Name Accepted Dates Actual Previously Approved Currently Published PAR Approved Sep ‘03 Initial WG Letter Ballot Mar ‘06 Recirculation WG Letter Ballot Oct ‘07 Form Sponsor Ballot Pool Jul ‘08 Initial Sponsor Ballot Dec ‘08 Nov ‘08 Jan ‘09 Recirculation Sponsor Ballot May ‘09 Final WG Approval Jul ‘09 Nov ‘09 Final EC Approval RevCom/ Stds Board Approval Sep ‘09 Jan ‘10 Publication Mar ‘10 Bruce Kraemer, Marvell Page 5 Bruce Kraemer, Marvell
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.