Download presentation
Presentation is loading. Please wait.
Published byCassidy Wymore Modified over 10 years ago
1
Phases – Revised Version. 27 June 2003 N.B.: This graph only gives on overview of the project phases and does not replace the work plan with respect to exact dates and responsibilities. Data Collection – WG1 - ROC Tools and User Guide – WG 2 - TU Ostrava Phase 1 Phase 2 First Part of Phase 3 20/02/0219 – 20 Juneend Sept.20 – 22 Nov. 5 National Reports: National practice overview National good practice Comparative Report: Key issues for development National Good practice examples First part of Phase 3: Revision of existing tools and development of new tools Prague Meeting 19 – 20 June Review of Conclusions of 5 reports Conclude on key issues for Phase 3 Discuss first draft of Synthesis Report – POSTPONED TO LISBON, NOV. 2003 Lisbon Meeting – transition phase 3 to 4 POSTPONED TO 20 – 22 NOV.. Analysis – WG1 - ROC
2
Phases – Revised Version. 27 June 2003 Testing - WG 3 – Athena Phase 4 15/01/04 – INTERIM REP. Phase 4 Testing Instruments ready Plan for 50 placements within on-going LdV mobility projects 50 Placements carried out Tools and User Guide – WG 2 - TU Ostrava Second Part of Phase 3 Second part of Phase 3: Draft User Guide 20 – 22 Nov. Lisbon Meeting Sept 2004 Tilburg Meeting – date to be decided spring 2004 Testing: Placements carried out Evaluation - WG 3 – TÜV Phase 5 Evaluation System designed Evaluation of Testing carried out Final User Guide and Tools Phase 5
3
Phases – Revised Version. 27 June 2003 Evaluation - WG 3 – TÜV Phase 5 Evaluation System designed Evaluation of Testing carried out Final User Guide and Tools November 2004 Practical Placements Database - WG 4 – ORFEO Phase 6 Phase 6: Database and Distribution of U.G and Tools Practical Placements Database set up Up-dating and Maintenance of information Dissemination - WG 5 – Ial Dissemination 2 Newsletters Web Site containing all project outputs 1 final International Conference 5 national dissemination seminars Dissemination is contained in Phases 6 and 7 Final International Conference in Italy December 2004 Possible additional meeting in Berlin – to be decided mid-Oct. Final User Guide & Tools
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.