Presentation is loading. Please wait.

Presentation is loading. Please wait.

LHC Morning Meeting - G. Arduini

Similar presentations


Presentation on theme: "LHC Morning Meeting - G. Arduini"— Presentation transcript:

1 LHC Morning Meeting - G. Arduini
Sat 17/11 – Sun 18/11 08:23 Stable beams 3296, initial lumi around 7.1x1033 cm-2s-1. 15:30 No beam from SPS Beam dump switch to be replaced) 20:40 Beam available from SPS 20:50 OP dump: ~180 pb-1 in 12:30 hours. 23:39 Stable beams Initial luminosity 7.3x1033 cm-2s-1. Larger tune split during the squeeze (-0.005) 00:03 Beam dump due to instability and losses on two bunches leading to BPM LSS6 trigger. ~10 pb-1 in 25 mins. Revert to smaller tune split (-0.003) and only during the last part of the squeeze 02:28 Stable beams Initial luminosity 7.5x1033 cm-2s-1 05:45 Beam dumped by OP on request of ALICE for an urgent intervention on the cooling of their TPC. End of fill 3298 producing ~70 pb-1 in 3:17 h. 06:20 Access starting 08:30 Access finished. Restarting 23/02/2019 LHC Morning Meeting - G. Arduini

2 LHC Morning Meeting - G. Arduini
Squeeze - Adjust b* Sep – IP1 BBQ-H B1 b*=80 cm 23/02/2019 LHC Morning Meeting - G. Arduini

3 3023 – 3368 – max. LR - collisions in 1/5/8
Squeeze - Adjust 3023 – 3368 – max. LR - collisions in 1/5/8 23/02/2019 LHC Morning Meeting - G. Arduini

4 LHC Morning Meeting - G. Arduini
Squeeze - Adjust b*=60 cm 23/02/2019 LHC Morning Meeting - G. Arduini

5 LHC Morning Meeting - G. Arduini
STABLE BEAMS After optimization 1-5-8 23/02/2019 LHC Morning Meeting - G. Arduini

6 LHC Morning Meeting - G. Arduini
STABLE BEAMS Sep – IP8 BBQ-V B2 23/02/2019 LHC Morning Meeting - G. Arduini

7 Beginning of Stable Beams
3296 QVB1-QVB2=-0.003 3297 QVB1-QVB2=-0.005 23/02/2019 LHC Morning Meeting - G. Arduini

8 Bunch length reduction in Stable Beams
M. Hostettler 23/02/2019 LHC Morning Meeting - G. Arduini

9 LHC Morning Meeting - G. Arduini
M. Hostettler 23/02/2019 LHC Morning Meeting - G. Arduini

10 Plan Physics Pending access:
Access wire scanner requested for Monday, including tunnel (RP). PM32 : CV to check / remove sand. Access system CMS (Hadronic Forward Calorimeter) > 1 h BI: wall current monitor (1 h – point 4 RF zone) LHC 8:30 meeting 17/11/2012

11 LHC Morning Meeting - G. Arduini
23/02/2019 LHC Morning Meeting - G. Arduini

12 LHC Morning Meeting - G. Arduini
M. Hostettler 23/02/2019 LHC Morning Meeting - G. Arduini


Download ppt "LHC Morning Meeting - G. Arduini"

Similar presentations


Ads by Google