Download presentation
Presentation is loading. Please wait.
1
802.11 Liaison to CableLabs November Update
Month 1998 doc.: IEEE /xxx November 2002 Liaison to CableLabs November Update Lior Ophir Texas Instruments Broadband Communications in Israel Herzlia, Israel L. Ophir, Texas Instruments
2
Outline Liaison Purpose CableHome Project Status
November 2002 Outline Liaison Purpose CableHome Project Status 802.11/CableLabs document access Next Steps L. Ophir, Texas Instruments
3
November 2002 Purpose Coordinate the use of WLANs in DOCSIS cable modem systems Method Understand MSO needs Leverage capabilities to meet needs of MSOs Introduce MSO needs in discussions L. Ophir, Texas Instruments
4
CableHome 1.0 Project Status
November 2002 CableHome 1.0 Project Status Successful Practice Wave Complete Currently in the Certification Stage (Cert Wave 24) Several Products Submitted for Certification L. Ophir, Texas Instruments
5
802.11/CableLabs Document Access
November 2002 802.11/CableLabs Document Access access into CableLabs documents Public Specifications available at Drafts/internal documents available ONLY under CableLabs IPR and/or NDA agreement for participating parties. For more details contact Steve Saunders at or Kevin Luehrs at L. Ophir, Texas Instruments
6
Next Steps Follow CableHome progress
November 2002 Next Steps Follow CableHome progress Update CableHome team from time to time on progress and status Inputs are welcome L. Ophir, Texas Instruments
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.