Download presentation
Presentation is loading. Please wait.
1
APE Update Nate Lipkowitz 9/13/2011
2
In Development LCLS: FEE mirror GUI
Goal: fast, reproducible mirror steering J. Turner, J. Lewandowski First test on Wednesday night MD Also: undulator pointing In Development
3
LCLS: Energy Calculator
Goal: better predict needed beam energy Invert J. Welch’s reckoning of photon energy Include spontaneous, wakefield losses, orbit compensation In Development
4
FACET: Energy feedbacks
EP01 (scav extraction) energy, using BPM 185 only LI20 (FACET chicane) energy using user-configurable set of LI20 BPMs and orbit fit To do: add orbit correction (SLC magnet control), bugfixes
5
Other things … FACET commissioning Code maintenance, CATERs
6
Other things … FACET commissioning Code maintenance, CATERs Vacation!!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.