Download presentation
Presentation is loading. Please wait.
Published byPolde Ninković Modified over 5 years ago
1
Jul 12, 2010 07/12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SGL2R Closing Report for May 2013 Date Submitted: May 2013 Source: Clint Powell, Powell Wireless Commsulting, LLC Contact: Clint Powell, Powell Wireless Commsulting, LLC Voice: , Re: SGL2R Closing Report for May 2013 Interim Abstract: Closing Report for the SGL2R Sessions in Waikoloa Purpose: Layer 2 (Mesh Under) Routing Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Page 1
2
Jul 12, 2010 07/12/10 SGL2R Ultimately draft a PAR and 5c for a project on Layer 2 (Mesh Under) Routing. ----- Meeting Notes (17/01/ :38) ----- Replace 1st paragraph with context for TVWS Page 2
3
Meeting Goals/Status Review Activities from March Mtg.
Jul 12, 2010 07/12/10 Meeting Goals/Status Review Activities from March Mtg. Liaison Updates/Presentations No updates or presentations Generate Draft PAR and 5c to Submit to WG Preliminary Draft PAR - doc.# Preliminary Draft 5c - doc. # Minutes: see doc. # Page 3
4
Study Group Motion Motion 1:
Jul 12, 2010 07/12/10 Study Group Motion Motion 1: request that the PAR and Five Criteria contained in documents and respectively be approved by the IEEE WG and that the EC be requested to forward the PAR to NesCom. Moved by Ben Rolfe Seconded by: Tom Herbst Approved by unanimous consent - no objections Page 4
5
Next Steps At Geneva (in July 2013)
07/12/10 Next Steps At Geneva (in July 2013) Address feedback on 802 review of PAR and 5c Update PAR and 5c based on feedback WG chair to present to EC at EOW mtg. Page 5
6
IGL2R Group Participation
Jul 12, 2010 07/12/10 IGL2R Group Participation Meeting # of IGL2R Sessions Avg. # of Individuals Avg. # of Entities July 2012 2 30 22 Sept. 2012 3 18 14 Nov. 2012 13 12 Nov. Tutorial ~110 Page 6
7
SGL2R Group Participation
Jul 12, 2010 07/12/10 SGL2R Group Participation Meeting # of SGL2R Sessions Avg. # of Individuals Avg. # of Entities Jan. 2013 3 20 16 March 2013 18 13 May 2013 5 22 15 Page 7
8
Work Group Motion Motion 1:
Jul 12, 2010 07/12/10 Work Group Motion Motion 1: request that the PAR and Five Criteria contained in documents and respectively be approved by the IEEE WG and that the EC be requested to forward the PAR to NesCom. Moved by Clint Powell Seconded by: Pat Kinney Page 8
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.