Download presentation
Presentation is loading. Please wait.
Published byTheodore Whitehead Modified over 6 years ago
1
Before any other work can start inside the house the joiners have to return and put a floor on top of the ceiling joists
2
Cutting the floor sheeting to size
3
Using a nail gun to fix the floor sheets in place
4
The floor in place
5
The house is fast reaching the stage when the electricians and plumbers will arrive so the building has to made secure. The windows have then to be fitted
6
Ready for the windows
7
The windows arrive
8
Fixing bracket in place
9
Windows nailed in place
10
Windows being sealed in place on the inside
11
Window in place ready to be trimmed and sealed
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.