System Development Charge (SDC) Basics
Presented by John Ghilarducci, FCS GROUP Principal 8201 – 164th Ave. NE, Suite 300, Redmond, WA 14020 SE Johnson Road, Suite 205, Milwaukie, OR
2
SDC Background Key Characteristics
ORS , defines “a uniform framework for the imposition of” SDCs, “to provide equitable funding for orderly growth and development in Oregon’s communities” Key Characteristics SDCs are one-time charges, not ongoing rates. SDCs are for capital only, in both their calculation and in their use. Properties which are already developed do not pay SDCs unless they “redevelop”. SDCs include both future and existing cost components. SDCs are for general facilities, not “local” facilities.
3
SDC Components and Calculation
Reimbursement Fee Eligible value of unused capacity in existing facilities Growth in system capacity demand Improvement Eligible cost of planned capacity increasing facilities System Development Charge per unit of capacity
4
Reimbursement Fee Methodology
5
Improvement Fee Methodology
6
Credits against the improvement fee must be provided for the construction of a capital improvement, which is: required as a condition of development, identified in an adopted capital facilities plan, and is either off-site or, if on-site, is required to provide more capacity than needed by the development in question.
7
Credit Requirements
8
Credit Requirements, continued
9
Sample SDC Calculation
10
Improvement Fee Calculation
Example Only
14
Reimbursement Fee Calculation
Example Only
15
Reimbursement Fee Cost Basis
Example Only
16
Sample Charges Example Only
17
Key Study Issues Appropriateness / Basis of reimbursement fee
Improvement fee allocation methods / Status of project lists Basis of charging Parks: Residential DU distinctions / Commercial? Transportation: Average daily vs. Peak-hour trip basis Area-specific charges SDC credit / indexing policy