Presentation is loading. Please wait.

Presentation is loading. Please wait.

LAMAS Working Group June 2017

Similar presentations


Presentation on theme: "LAMAS Working Group June 2017"— Presentation transcript:

1 LAMAS Working Group 19-21 June 2017
Agenda Item 4.1 Future validation in the Labour Force Survey Eurostat

2 LFS: rules with legal status
Commission Regulation (EC) 377/2008 Position of variables in records Range of values that a variable can take Filter conditions determining possible values of a variable depending on other ones Eurostat

3 Future validation in the LFS
NSIs to correct RANGE and FILTER errors before transmission; no editing at Eurostat Use of corporate validation system to check files 2 options: Validation only Transmission after successful validation Eurostat

4 Future data transmission
Single record format for all transmission (as now) Quarterly datasets with Q variables Y, M variables can be included for validation One annual dataset Y variables, M variables, household subsamples where applicable Replication of Q variables to avoid linking datasets and simplify validation and data processing Weights: household weights needed only in case of household subsampling Revisions: complete retransmission of files

5 Timing Eurostat to develop new LFS validation system in 2018-19
Target date for implementation: end of 2019 Ideally with IESS implementation, but Testing with NSIs needed Transition period required during which old and new system run in parallel and NSIs can adapt

6 Future of SAS validation programs
Available at least until the new system is fully implemented The new validation system will provide the same functionality Sending files to Eurostat for validation, without official transfer Detailed validation reports indicating errors and warnings Official transfer when errors are corrected

7 Error vs. warning Error Warning Range, filter checks with legal status
Possible further ones to be agreed upon Errors lead to file rejection Warning Plausibility checks deserving review / improvement E.g. household composition, hours worked… File passes validation

8 Resource impact on NSIs?
Adaptation of IT to new file structure: low no SDMX Correction of errors: ? Correction programs Reducing errors at data collection Eurostat now does it for >30 countries

9 Way forward Expert meeting on 6-7 February 2018 Validation rules
Error reporting Data transmission

10 LAMAS is invited to comment on :
proposals on data validation proposals on data transmission Eurostat


Download ppt "LAMAS Working Group June 2017"

Similar presentations


Ads by Google