Presentation is loading. Please wait.

Presentation is loading. Please wait.

Job Performance Requirement 10-15

Similar presentations


Presentation on theme: "Job Performance Requirement 10-15"— Presentation transcript:

1 Job Performance Requirement 10-15
Flat Load

2 A A water supply flat load starts with the male end
of the hose on the right side of the bed at the rear. This will allow this hose load to be connected to another hose load for long hose lays. JPR 10-15A

3 B The hose is laid flat until the front is reached
where the hose is folded over and brought to the rear. When back at the rear, turn the hose off the first layer and lay it flat next to the first row. JPR 10-15B

4 C When the edge of the hose bed is reached,
a second layer is started with a double layer, moving back to the right side of the bed. JPR 10-15C

5 D An appliance, such as a ball valve, can
be placed on the female end on top of the load. JPR 10-15D


Download ppt "Job Performance Requirement 10-15"

Similar presentations


Ads by Google