Download presentation
Presentation is loading. Please wait.
1
Camp Lejeune Contaminated Water Project
FY14: Oct-Mar 2014 We have been experiencing an increase in receipts of medical opinion request since Jan 2014. The number of exams in category increased 29% since the last report, from 110 to 78. 50 cases are pending SME assignment, oldest case is pending 9 days Pending Workload by Site Site Name No. Cases No. SME’s Ft. Drum, NY 13 4 Ft. Wainwright, AK 12 9 Ft. Meade, MD 14 Portsmouth NMC, VA 10 Lewis JB, WA 16 Ft. Bliss, TX 7 Ft. Bragg, NC 6 Heidelberg MEDDAC, Germany Richardson JB, AK Office of Disability & Medical Assessment
2
Camp Lejeune Contaminated Water Project
FY14: Oct-Mar 2014 Pending Workload by Site Office of Disability & Medical Assessment
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.