Presentation is loading. Please wait.

Presentation is loading. Please wait.

BRAVO SEARCHES COMPLETED ON 11 AUG 08

Similar presentations


Presentation on theme: "BRAVO SEARCHES COMPLETED ON 11 AUG 08"— Presentation transcript:

1 BRAVO SEARCHES COMPLETED ON 11 AUG 08
NM OF TRACKLINE SEARCHED 12 SEARCHES 5 - HH-60J 2 – C.A.P. 1 – A.S.T. 2 – ANG 1 – STA JUNEAU (CG) 1 – GOOD SAM

2 CHARLIE SEARCHES COMPLETED ON 12 AUG 08
2 - HH-60J (CG) 2 – ANG 1 – CAP 1 – CGC LIBERTY 2 – GOOD SAM NM OF TRACKLINE SEARCHED

3 38.98 NM OF TRACKLINE SEARCHED
DELTA SEARCHES COMPLETED 13 AUG 08 38.98 NM OF TRACKLINE SEARCHED 1 SEARCH 1 – ANG

4 705.5 NM OF TRACKLINE SEARCHED
ECHO SEARCHES COMPLETED FOR 14 AUG 08 705.5 NM OF TRACKLINE SEARCHED 8 SEARCHES 3 – HH-60J (CG) 1 – ANG 4 – C.A.P.

5 562.93 NM OF TRACKLINE SEARCHED
FOXTROT SEARCHES COMPLETED 15 AUG 08 NM OF TRACKLINE SEARCHED 6 SEARCHES 2 – HH-60J (CG) 2 – ANG 2 – C.A.P.


Download ppt "BRAVO SEARCHES COMPLETED ON 11 AUG 08"

Similar presentations


Ads by Google