Presentation is loading. Please wait.

Presentation is loading. Please wait.

LAMAS Working Group 29 June-1 July 2016

Similar presentations


Presentation on theme: "LAMAS Working Group 29 June-1 July 2016"— Presentation transcript:

1 LAMAS Working Group 29 June-1 July 2016
Agenda Item 4.2 TF2: Transition into retirement Eurostat

2 Overview: Transition into retirement
AHM data of 2012 Evaluation report of the 2012 data June 2015 LAMAS proposal TF2 work in 2016 May 2016 LAMAS online consultation Eurostat

3 The module in brief Target population: all aged 50+
PENSTYP variables: ESSPROS methodology AGEPENS, EARLYRET – maintained More info on disability pensions (AGEPENSD) Some info on groups at risk (BUILDPEN, PENSSUFF) More on working conditions of the elderly Specific info on care responsibilities Indicators on longer working life

4 'Transition' challenges
From work to retirement Without pension With pension Inactive or unemployed In employment Never worked No pension contribution Some pension contribution

5 Variables on old-age pension
Type of pension (ESSPROS link -> mappings) Old-age: statutory, occupational, personal, other Disability Other Age when receiving pension Old-age Groups at risk of not receiving a (sufficient) pension Pension contribution (app. no of years) Pension sufficiency for making ends meet

6 Variables on retirement
Actual retirement vs statutory retirement age Reason for early retirement Care responsibilities as a reason for retirement Filter: those with An old-age pension and Working or already retired

7 Variables on longer working lives
Longer than the statutory retirement age Motivation vs obstacles Filter: those In employment or Retired at (or later than) statutory age

8 Variables on working conditions
Satisfaction with current / last job Satisfaction with flexibility of working time arrangements Reduced working hours, possibly related to a retirement scheme Filter: those In employment or Not in employment, but who had a job

9 Testing A list of 15 variables
Sub-action co-financed through grants 2016 Testing encouraged! Test report for TF2 by 31 March 2017

10 LAMAS is invited to: Take note of the ongoing process defining the Transition to retirement module Use the same technical specifications for testing Optional: test STAYWORK, RETASAP


Download ppt "LAMAS Working Group 29 June-1 July 2016"

Similar presentations


Ads by Google