THE DEPARTMENT OF LABOUR QUARTER 1 and 2 PERFORMANCE REPORT

Similar presentations


Presentation on theme: "THE DEPARTMENT OF LABOUR QUARTER 1 and 2 PERFORMANCE REPORT"— Presentation transcript:

1 THE DEPARTMENT OF LABOUR QUARTER 1 and 2 PERFORMANCE REPORT
01 APRIL 2016 TO 30 SEPTEMBER 2016 ANNUAL PERFORMANCE PLAN (APP) Presentation to the Labour Portfolio Committee: 7 December 2016

2 TABLE OF CONTENTS INTRODUCTION LEGEND
OVERALL ACHIEVEMENTS PER STRATEGIC OBJECTIVES AND PER BRANCH DURING QUARTER 1 OF THE FINANCIAL YEAR OVERALL ACHIEVEMENTS PER STRATEGIC OBJECTIVES AND PER BRANCH DURING QUARTER 2 OF THE FINANCIAL YEAR OVERALL ACHIEVEMENTS AND MAJOR PERFORMANCE CHALLENGES ENCOUNTERED DURING THE QUARTER 2 OF CONCLUSION Chief Directorate Communication |

3 INTRODUCTION INTRODUCTION - The Constitutional Mandate of the DoL - The Policy Mandate of the DoL

4 INTRODUCTION: THE CONSTITUTIONAL MANDATE OF THE DOL
Section 9, to ensure equal access to opportunities. Section 10, promotion of labour standards and fundamental rights at work. Section 18, Freedom of association. Section 23, To ensure sound Labour relations. Section 24, To ensure an environment that is not harmful to the health and wellbeing of those in the workplace. Section 27, To provide adequate social security nets to protect vulnerable workers. Section 28, To ensure that children are protected from exploitative labour practices and not required or permitted to perform work or services that are inappropriate for a person of that child’s age or their well‐being, education, physical or mental health or spiritual, moral or social development is placed at risk. Section 34, Access to courts and access to fair and speedy labour justice.

5 INTRODUCTION: THE POLICY MANDATE OF THE DOL
Improved economic efficiency and productivity. Creation of decent employment. Promoting labour standards and fundamental rights at work. Providing adequate social safety nets to protect vulnerable workers Sound labour relations. Eliminating inequality and discrimination in the workplace. Enhancing occupational health and safety awareness and compliance in the workplace. Give value to social dialogue in the formulation of sound and responsive legislation and policies to attain labour market flexibility for competitiveness of enterprises which is balanced with the promotion of decent employment

6 LEGEND Implication: Achieved
Performance Indicator is on track or reflects complete implementation. Target achieved   100% + Complete Implication: Partially Achieved Performance Indicator is on track but the target has not been   completely achieved. 75-99% Complete Implication: Not Achieved Performance Indicator behind schedule. Target not achieved immediate intervention is needed.   0% - 75% Complete

7 OVERALL PERFORMANCE OVERALL ACHIEVEMENTS PER STRATEGIC OBJECTIVE AND PER BRANCH DURING QUARTER 1 OF

8 QUARTER 1 PERFORMANCE PER STRATEGIC OBJECTIVE 2016/17
Strategic Objectives Annual Planned Indictors Indicators with targets reporting in Q1 Achieved Partially Achieved Not Achieved Overall Achievement % Contribute to employment creation 8 5 3 63% Promote equity in the labour market 1 60% Protecting vulnerable workers 6 2 50% Strengthening multilateral and bilateral relations** - Strengthening occupational safety protection 4 67% Promoting sound labour relations 0% Monitoring the impact of legislations 100% Strengthening the institutional capacity of the Department 80% Total number of Indicators 35 34 21 7 62% Overall Performance 18% 20% *** There was no target for ‘”Strengthening multilateral and bilateral relations” ****Promote equity in the labour market includes IES + LP&IR Indicator 1.1 ****Protecting vulnerable workers includes IES+ LP&IR Indicator 2.1

9 QUARTER 1 PERFORMANCE PER PROGRAMME 2016/17
Branch Annual Planned Indicators Indicators with targets reporting in Quarter 1 Achieved Partially Achieved Not Achieved Overall Achievement% Administration 5 4 1 80% Inspections and Enforcement Services 15 9 2 60% Public Employment Services 8 3 63% Labour Policy and Industrial Relations 7 6 50% Total number of Indicators 35 34 21 62% Overall Performance 18% 20%

10 OVERALL PERFORMANCE OVERALL ACHIEVEMENTS PER STRATEGIC OBJECTIVE AND PER BRANCH DURING QUARTER 2 OF

11 QUARTER 2 PERFORMANCE PER STRATEGIC OBJECTIVE 2016/17
Strategic Objectives Annual Planned Indictors Indicators with targets reporting in Q2 Achieved Partially Achieved Not Achieved Overall Achievement % Contribute to employment creation 8 5 - 3 63% Promote equity in the labour market 4 1 80% Protecting vulnerable workers 6 Strengthening multilateral and bilateral relations 100% Strengthening occupational safety protection 67% Promoting sound labour relations 2 50% Monitoring the impact of legislations Strengthening the institutional capacity of the Department 60% Total number of Indicators 35 32 22 69% Overall Performance 12% 19% *** There was no target for ‘”Strengthening multilateral and bilateral relations” ****Promote equity in the labour market includes IES + LP&IR Indicator 1.1 ****Protecting vulnerable workers includes IES+ LP&IR Indicator 2.1

12 QUARTER 2 PERFORMANCE PER PROGRAMME 2016/17
Branch Annual Planned Indicators Indicators with targets reporting in Quarter 2 Achieved Partially Achieved Not Achieved Overall Achievement % Administration 5 3 1 60% Inspections and Enforcement Services 15 11 73% Public Employment Services 8 - 63% Labour Policy and Industrial Relations 7 4 80% Total number of Indicators 35 32 22 6 69% Overall Performance 12% 19%

13 2016/17 QUARTER 1 AND QUARTER 2 INSPECTIONS AND INFORCEMENT (IES) PERFORMANCE PER PROVINCE
Planned Indictors Achieved Partially Achieved Not Achieved Overall Performance Overall Performance% Eastern Cape 13 11 2 - 85% 100% Free State 10 1 77% 12 92% Gauteng 9 4 69% KwaZulu-Natal Limpopo Mpumalanga Northern Cape 3 North West Western Cape

14 2016/17 QUARTER 1 AND QUARTER 2 PUBLIC EMPLOYMENT SERVICES (PES) PERFORMANCE PER PROVINCE
Planned Indictors Achieved Partially Achieved Not Achieved Overall Performance % Eastern Cape 7 - 100% Free State 6 1 86% Gauteng 4 2 57% 5 71% KwaZulu-Natal 83% Limpopo Mpumalanga Northern Cape North West 3 43% Western Cape 42%

15 QUARTER 2: 2016-17 PERFORMANCE INFORMATION
MAJOR PERFORMANCE CHALLENGES ENCOUNTERED DURING QUARTER 2 OF THE FINANCIAL YEAR JULY 2016 – SEPTEMBER 2016

16 PROGRAMME 1: ADMINISTRATION

17 PROGRAMME 1: ADMINISTRATION
Strategic Goal 8: Strengthening the institutional capacity of the Department (OUTCOME 12: AN EFFICIENT, EFECTIVE AND DEVELOPMENT ORIENTED PUBLIC SERVICE) KEY PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION 1.1 Improve the Department’s management practice and strategic support based on the Management Performance Assessment Tool (M-PAT) assessment criteria. 55% of total Department’s M-PAT standards at compliance Levels 3 and 4 M-PAT Self-Assessment report signed off by the DG and submitted to DPME by 30 September 2016 ACHIEVED MPAT 1.6 was submitted by the ADG on the 30th September 2016 2% 55% of total Department’s M-PAT standards at level 3 and 4 by September 2016 based on the self-assessment report 69% of total Department’s M-PAT standards at level 3 and 4 by September 2016 14% More M-PAT awareness and prioritisation 2.1 Percentage of vacancy rate reduced by 31 March 11% PARTIALLY ACHIEVED 11.5% No. of Funded Posts: 8701 No. of Posts filled: 7700 No. of vacant Posts: 1001 Delays in filling of posts. Project/Action plan for the filling of vacant positions has since been developed.

18 KEY PERFORMANCE INDICATOR
ADMINISTRATION Strategic Goal 8: Strengthening the institutional capacity of the Department (OUTCOME 12: AN EFFICIENT, EFECTIVE AND DEVELOPMENT ORIENTED PUBLIC SERVICE) KEY PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION 3.1 Number of Annual Financial Statements (AFS) and Interim Financial Statements (IFS) compiled per year that comply with guidelines issued by the National Treasury. Q1 -31 July 2016 ACHIEVED IFS compiled and submitted to National Treasury and the Auditor-General on 31st July None 4.1 Percentage of compliant invoices paid within 30 days of receipt 100% PARTIALLY ACHIEVED 99.9% No. of invoices received during the period: 4232 Paid within 30 days: 4226 % paid within 30 days: 99.9% Paid after 30 days: 6 Variance 0.1% Banking details Implementation of CSD (Central Supplier Database) by National Treasury where banking details are verified before suppliers are made available on the database. All suppliers on CSD will have verified banking details.

19 KEY PERFORMANCE INDICATOR
ADMINISTRATION Strategic Goal 8: Strengthening the institutional capacity of the Department (OUTCOME 12: AN EFFICIENT, EFECTIVE AND DEVELOPMENT ORIENTED PUBLIC SERVICE) KEY PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION 4.2 Percentage reporting of detected irregular, fruitless and wasteful and unauthorized expenditure ()TR9.1.2 100% ACHIEVED Irregular expenditure detected: R169 699.27 Fruitless & Wasteful expenditure: None Unauthorized expenditure detected: R169 699.27 None

20 PROGRAMME 2: INSPECTION AND ENFORCEMENT SERVICES

21 INSPECTION AND ENFORCEMENT SERVICES (IES)
KEY PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION PROMOTE EQUITY IN THE LABOUR MARKET 1.1 Number of designated employers reviewed per year to determine compliance with employment equity legislation 242 ACHIEVED Actual reviewed: 322 Number compliant: 4 Variance: 80 Human capacity was improved. 1.2 Percentage of non-compliant employers of those reviewed in reference to 1.1 issued with a recommendation within 90 days of the review 100% Of the 322 employers reviewed, 318 were non-compliant. 100% (318 of the 318) non-compliant employers) were issued with recommendations within 90 days of the review. None

22 INSPECTION AND ENFORCEMENT SERVICES (IES)
KEY PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION PROMOTE EQUITY IN THE LABOUR MARKET 1.3 Number of designated employers inspected per year to determine compliance with employment equity legislation 1 419 PARTIALLY ACHIEVED Actual inspected 1 403 Number Compliant: 1 143 Variance: -16 Human capacity challenges in that there was a need to provide training . 36 Inspectors were trained on the 14th – 15th November 2016, to address the gaps that were identified. 1.4 Percentage of non-complying workplaces inspected per with reference to 1.3 dealt with in terms of the Employment Equity Act 100% ACHIEVED Of the workplaces inspected, 263 were non-compliant. 100% (263 of the 263) non-compliant workplaces) was dealt with in terms of the Employment Equity Act. Notices issued: 200 Court referrals: 27 Subpoena/Other: 15 None

23 INSPECTION AND ENFORCEMENT SERVICES
KEY PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION PROTECT VULNERABLE WORKERS 2.1 Number of workplaces inspected per year to determine compliance with labour legislation 40 487 ACHIEVED A total of workplaces were inspected with a variance of There were blitz inspections conducted and resulted in Branch over-achieving the target None 2.2 Percentage of non-complying workplaces inspected with reference to 2.1 per year dealt with in terms of the relevant labour legislation 100% 100% of the workplaces inspected, 6 284 were non-compliant. 100% (6 284 of the 6284) non-compliant workplaces) were dealt with in terms of the relevant labour legislation

24 INSPECTION AND ENFORCEMENT SERVICES
KEY PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION PROTECT VULNERABLE WORKERS 2.3 Number of advocacy and educational sessions conducted per year in identified sectors 1 Hazardous Biological Agents seminar PARTIALLY ACHIEVED One seminar in the Hazardous Biological Agents was conducted 1 Training Program 175 shop stewards trained Number of shop stewards trained: 116 Variance: -59 Poor attendance by shop stewards. In the 2017/18 financial year, training will be conducted upon request by the shops stewards.

25 INSPECTION AND ENFORCEMENT SERVICES
KEY PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION PROTECT VULNERABLE WORKERS 2.4 Percentage of inspections on request for work permits conducted within 25 calender days 90% ACHIEVED 98% Of the 119 requests received, 98% (117) inspections were conducted within 25 calendar days. The work permits applications are given priority. None 2.5 Percentage of non-complying workplaces inspected with reference to 2.4 per year dealt with in terms of the relevant labour legislation 100% Of the 117 workplaces that were inspected 6 were non-compliant. 100% (6 of 6) were dealt with in terms of the relevant labour legislation. Notices issued: 6 Court referrals: 0 Other: 0

26 INSPECTION AND ENFORCEMENT SERVICES
KEY PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION STRENGTHEN OCCUPATIONAL SAFETY AND PROTECTION 3.1 Number of workplaces inspected per year to determine their compliance with the OHS legislation 6 590 ACHIEVED 7 238 workplaces were inspected with a variance of 648 There were blitz inspections conducted and resulted in Branch over-achieving the target. 3.2 Percentage of non-complying workplaces inspected with reference to 3.1 dealt with in terms of the OHS legislation 100% Of the workplaces inspected, were non-compliant. 100% (2400 of the 2400) non-compliant workplaces) were dealt with in terms of OHS None

27 INSPECTION AND ENFORCEMENT SERVICES
KEY PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION STRENGTHEN OCCUPATIONAL SAFETY AND PROTECTION 3.3 Percentage of reported incidents investigated within 90 calendar days 62% ACHIEVED Of the 273 reported incidents, 78% (213) were investigated within 90 calendar days. Incidents were given priority 3.4 Percentage of applications for registration of entities processed within 60 calendar days 80% Of the applications received, 98% (2 400) were processed within 60 calendar days Employers are submitting complete information which makes it easier to finalize the application on time. 3.5 Amendments to the Occupational Health and Safety Act processed through the relevant structure (Cabinet) by 31 March 2017 OHS Amendment Bill submitted to Cabinet Submit to Cabinet NOT ACHIEVED Submission has been delayed Delay was as a result of further consultation requirements by National Treasury Further engagements between the Economic Cluster and National Treasury are underway.

28 INSPECTION AND ENFORCEMENT SERVICES
KEY PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION STRENGTHEN OCCUPATIONAL SAFETY AND PROTECTION 3.6 Number of employer payroll audits conducted per year to determine employers contribution to the Unemployment Insurance Fund 3 905 PARTIALLY ACHIEVED A total of employer audits were conducted with a variance of -221. High turnover of staff. Vacancies are filled but newly appointed auditors require training. As of 28 November 2016 newly recruited auditors are undergoing a six month training to be ready to conduct inspections.

29 PROVINCIAL PERFORMANCE ON IES INDICATORS: Q2 TARGETS
BRANCH EC FS GP KZN LP MP NC NW WC TOTAL 1.1 Number of designated employers reviewed per year to determine compliance with employment equity legislation ACHIEVED. 322 employers were reviewed against a target of 242 Target: 242 36 10 62 18 6 22 14 12 Actual reviewed 322 46 95 8 37 17 19 64 1.2 Percentage of non-compliant employers of those reviewed in reference to 1.1 issued with a recommendation within 90 days of the review. ACHIEVED Of the 322 employers reviewed, 318 were non-compliant. 100% (318 of the 318 non-compliant employers) were issued with recommendations . 100% Number of employers not complying 318 No. issued with recommendations within 90 days

30 PROVINCIAL PERFORMANCE ON IES INDICATORS
BRANCH EC FS GP KZN LP MP NC NW WC Total 1.3 Number of designated employers inspected per year to determine compliance with employment equity legislation PARTIALLY ACHIEVED 1 403 employers were inspected against a target of Target 1 419 115 72 583 194 36 58 26 54 281 Actual Inspected 1 403 132 88 401 227 27 99 25 92 312

31 PROVINCIAL PERFORMANCE ON IES INDICATORS
BRANCH EC FS GP KZN LP MP NC NW WC Total 1.4 Percentage of non-complying workplaces inspected per year with reference to 1.3. dealt with in terms of the Employment Equity Act. ACHIEVED Of the workplaces inspected, 263 were non-compliant. 100% (263 of the 263) non-compliant workplaces) was dealt with in terms of the Employment Equity Act. Target 100% 36 1 13 63 19 39 18 20 54 263 Number not complying Percentage dealt with 263 (100%)

32 PROVINCIAL PERFORMANCE ON IES INDICATORS
BRANCH EC FS GP KZN LP MP NC NW WC 1.4 Percentage of non-complying workplaces inspected per year with reference to 1.3. dealt with in terms of the Employment Equity Act. Actions Taken Notices Issued 200 1 13 51 19 39 18 20 Court Referrals 27 8 12 2 5 Subpoenas 15 32

33 PROVINCIAL PERFORMANCE ON IES INDICATORS
BRANCH EC FS GP KZN LP MP NC NW WC Total 2.1 Number of work places inspected per year to determine compliance with labour legislation. ACHIEVED A total of workplaces were inspected. Target 40 487 4838 3176 9062 8913 3656 2995 1573 2434 3840 Actual No. inspected 44 004 5856 3449 9174 9891 3735 3633 1198 2835 4233

34 PROVINCIAL PERFORMANCE ON IES INDICATORS
BRANCH EC FS GP KZN LP MP NC NW WC Total 2.2 Percentage of non-complying workplaces inspected per year with reference to 2.1 dealt with in terms of the relevant labour legislation ACHIEVED Of the workplaces inspected, were non-compliant. 100% (6 284 of the 6 284) non-compliant workplaces) were dealt with in terms of the relevant labour legislation. Target: 100% 6 284 No. of workplaces not complying 590 261 1136 1750 300 462 210 158 1417 Actions taken: No. of notices issued Referred to court 132 34 86 2 5 Subpoenas 164 156 8

35 PROVINCIAL PERFORMANCE ON IES INDICATORS
BRANCH EC FS GP KZN LP MP NC NW WC Total 2.4 Percentage of inspections on request for work permits conducted within 25 calendar days ACHIEVED Of the 119 requests received, 98% (117) inspections were conducted within 25 calendar days. Target: 90% No. of requests received 12 03 47 11 7 18 3 1 17 119 No. inspected within 25 calendar days 45 117 % inspected within 25 calendar days 100% 96% 98%

36 PROVINCIAL PERFORMANCE ON IES INDICATORS
BRANCH EC FS GP KZN LP MP NC NW WC Total 2.5 Percentage of non-complying workplaces inspected with reference to 2.4 per year dealt with in terms of the relevant labour legislation ACHIEVED Out of the 117 inspected 6 were non-compliant and 111 were classified as complying. 100% (6 of 6) non-complying workplaces inspected were dealt with in terms of the relevant labour legislation Target: 100% No. of workplaces not complying 2 1 6 No. compliant 12 3 45 9 5 18 16 111 No. of work places dealt with % workplaces dealt with 0%

37 PROVINCIAL PERFORMANCE ON IES INDICATORS
BRANCH EC FS GP KZN LP MP NC NW WC Total 3.1 Number of workplaces inspected per year to determine their compliance with the OHS legislation. ACHIEVED 7 238 against a target of workplaces were inspected Target 6 590 740 637 1680 1440 475 246 220 407 745 6590 Actual No. Inspected 7 238 596 1834 1561 548 359 90 643 867 7238 3.2 Percentage of non-complying workplaces inspected with reference to 3.1 dealt with in terms of the OHS legislation. . Of the workplaces inspected, were non-compliant. 100% (2 400 of the 2 400) non-compliant workplaces) was dealt with in terms of OHS 100% No. of workplaces not complying 234 206 760 481 170 162 38 177 172 2 400 No. of workplaces dealt with Actions taken No. of notices issued 238 222 635 607 179 42 181 2 446 No. referred to court 3 20 2 1 6 36

38 PROVINCIAL PERFORMANCE ON IES INDICATORS
BRANCH EC FS GP KZN LP MP NC NW WC Total 3.3 Percentage of reported incidents investigated within 90 Calendar days. ACHIEVED Of the 273 reported incidents, 78% (213) were investigated within 90 calendar days. Target 62% No. of reported incidents 44 19 27 92 26 9 3 34 273 No. investigated within 90 calendar days 35 17 22 70 6 7 213 % investigated within 90 calendar days 78% 80% 89% 81% 76% 23% 100%

39 PROVINCIAL PERFORMANCE ON IES INDICATORS
BRANCH EC FS GP KZN LP MP NC NW WC HQ Total 3.4. Percentage of applications for registration of entities processed within 60 calendar day. ACHIEVED. Of the applications received, 98% (2 400) were processed within 60 calendar days. Target 80% No. of applications received 362 81 289 345 7 120 30 13 1191 2 438 No. processed within 60 calendar days 6 1154 2 400 % investigated within 60 calendar days 100% 86% 0% 97% 98%

40 PROVINCIAL PERFORMANCE ON IES INDICATORS
BRANCH EC FS GP KZN LP MP NC NW WC Total 3.6 Number of employer payroll audits conducted per year to determine employers contribution to the Unemployment Insurance Fund. PARTIALLY ACHIEVED A total of employer audits were conducted. Target 3 905 349 356 698 504 385 407 353 367 386 3905 Actual conducted 3 684 410 379 572 541 324 397 265 474 322 3684 Number of employers contributing 300 236 328 458 226 204 175 372 129 2428

41 PROGRAMME 3: PUBLIC EMPLOYMENT SERVICES

42 PUBLIC EMPLOYMENT SERVICES
Strategic Goal 1: Contribute to decent employment creation (OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH) PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION 1.1 Number of regulations and policies in terms of the Employment Service Act tabled to the ES Board per year Regulations on; registration of work-seekers section 52, tabled to the ES Board NOT ACHIEVED Draft Regulations in place but not yet tabled to the ES Board ES Board was established at the end of Q2 The ES Board was established towards end of Q and will convene during Q3. 1.2 Number of PES advocacy campaigns conducted per year 79 ACHIEVED A total of 186 advocacy campaigns were conducted. with a variance of 107 High demand for advocacy campaigns None 1.3 Number of work-seekers registered on ESSA per year   A total work-seekers were registered on ESSA system, with a variance of 21 326 Advocacy campaign reach out to work-seekers

43 PUBLIC EMPLOYMENT SERVICES
Strategic Goal 1: Contribute to decent employment creation (OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH) PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION 1.4 Number of registered work-seekers provided with employment counseling per year 77 970 ACHIEVED 101 362 registered work-seekers were provided with employment counselling; with a variance of 23 392. Advocacy campaign and exhibition reach out to work-seekers None 1.5 Number of registered employment opportunities filled by registered work seekers per year 3 990 A total of 4 919work-seekers were placed in registered employment opportunities; with a variance of 929. Advocacy campaigns conducted, and partnerships established with employers. Confirmation of Work-seeker referred for placement during 4th quarter was received during Q2.    1.6 Number of work opportunities registered on ESSA per year 30 080 A total of opportunities were registered on ESSA; with a variance of 5 323

44 PUBLIC EMPLOYMENT SERVICES
PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION 1.7 Percentage of applications from Private Employment Agencies and Temporary Employment Services processed within 60 calendar days 100% complete PEA and TES applications processed within 60 calendar days of receipt NOT ACHIEVED 84 out of 129 (65%) were processed within 60 calendar days and 45 (35%) were processed beyond 60 days. Delays in the verification process of the applicants information. Implement improvement plans with underperforming provinces during third quarter. 2.1 Percentage of applications for foreign nationals corporate and individual work visa processed within 30 working days 70% complete applications for foreign nationals corporate and individual work visa processed within 30 working days 82 out of 187 (44%) was processed within 30 working days Delays in the verification process of the applicants information Implement improvement plans during third quarter.

45 PUBLIC EMPLOYMENT SERVICES
Strategic Goal 1: Contribute to decent employment creation (OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH) PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION 1.2 Number of PES advocacy campaigns conducted per year 79 ACHIEVED A total of 186 advocacy campaigns were conducted. High demand for advocacy campaigns. None Prov. Targeted Provincial advocacy campaigns Actual provincial advocacy campaigns conducted Variances Q2 EC 10 30 20 FS 7 12 5 GP 15 22 KZN 24 14 LP 8 35 27 MP 9 18 NC NW 17 WC 1 TOTAL 79 186 107

46 PUBLIC EMPLOYMENT SERVICES
Strategic Goal 1: Contribute to decent employment creation (OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH) PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION 1.3 Number of work-seekers registered on ESSA per year   ACHIEVED A total of work-seekers were registered on ESSA system, with a variance of Advocacy campaign reach out to work-seekers None Prov. Target to be registered Actual registered Variances Q2 EC 14850 18 251 3401 FS 8100 10 869 2769 GP 32400 35 679 3279 KZN 22950 27 173 4223 LP 15 333 7233 MP 9450 13 362 3912 NC 2700 4 810 2110 NW 6750 10 111 3361 WC 16200 17 321 1121 *Other 13 500 3 417 -10083 TOTAL 21 326 *Other include: Online registration, UIF Section 17 beneficiaries programmatically imported from Siyaya. The “Other” target is based on projected increase of online self-registration usage and UIF imports.

47 PUBLIC EMPLOYMENT SERVICES
Strategic Goal 1: Contribute to decent employment creation (OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH) PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION 1.4 Number of registered work-seekers provided with employment counseling per year 77 970 ACHIEVED registered work-seekers were provided with employment counselling; with a variance of Advocacy campaign and exhibition reach out to work-seekers Provinces Target to be provided with counseling Actual provided with counseling Variances Q2 EC 9 390 13 020 3 630 FS 5 620 9 345 3 725 GP 17 890 20 631 2 741 KZN 8 460 11 835 3 375 LP 14 780 5 390 MP 10 127 1 667 NC 4 680 4 469 -211 NW 10 410 1 950 WC 6 033 413 *Other 712 TOTAL 77 970 23 392 *Other include: Online registration, UIF Section 17 beneficiaries programmatically imported from Siyaya. The “Other” target is based on projected increase of online self-registration usage and UIF imports. 47

48 PUBLIC EMPLOYMENT SERVICES
Strategic Goal 1: Contribute to decent employment creation (OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH) PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION 1.5 Number of registered employment opportunities filled by registered work seekers per year 3 990 ACHIEVED A total of work-seekers were placed in registered employment opportunities; with a variance of 929. Advocacy campaigns conducted, and partnerships established with employers. Confirmation of Work-seeker referred for placement during 4th quarter was received during Q2. None Provinces Target to be filled Actual filled Variances Q2 EC 550 921 371 FS 320 428 108 GP 750 867 117 KZN 700 1 120 420 LP 350 696 346 MP 242 -78 NC 200 297 97 NW 250 24 -226 WC 323 -227 *OTHER 1 TOTAL 3 990 4 919 929 *Other include: Online registration, UIF Section 17 beneficiaries programmatically imported from Siyaya. The “Other” target is based on projected increase of online self-registration usage and UIF imports. 48

49 PUBLIC EMPLOYMENT SERVICES
Strategic Goal 1: Contribute to decent employment creation (OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH) PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION 1.6 Number of work opportunities registered on ESSA per year 30 080 ACHIEVED A total of opportunities were registered on ESSA; with a variance of Advocacy campaigns conducted, and partnerships established with employers. None Province Target to be registered Actual registered Variances Q2 EC 4200 4 507 307 FS 2400 2 687 287 GP 5700 7 438 1 738 KZN 5180 6 478 1 298 LP 2700 2 754 54 MP 1 683 -717 NC 1500 2 421 921 NW 1800 1 453 -347 WC 5 753 1 553 *Other 229 TOTAL 30 080 35 403 5 323 *Other refers to online/Head Office registered opportunity

50 PUBLIC EMPLOYMENT SERVICES
PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION AND IMPLEMENTATION DATE 1.7 Percentage of applications from Private Employment Agencies and Temporary Employment Services processed within 60 calendar days 100% complete PEA and TES applications processed within 60 calendar days of receipt NOT ACHIEVED 65% 84 of the 129 (65%) applications were processed within 60 calendar days and 45 (35%) were processed beyond 60 days. Delays in the verification process of the applicants information. Implement improvement plans with underperforming provinces during third quarter. Provinces Total received Actual processed within 60 days % processed within 60 days Processed beyond 60 days % processed beyond 60 days Q2 EC 7 100% FS 3 GP 40 38 95% 2 5% KZN 20 10 50% LP 5 6 120% MP 4 NC 1 0% NW WC 45 14 31% 31 69% TOTAL 129 84 65% 35 %

51 PUBLIC EMPLOYMENT SERVICES
PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION AND IMPLEMENTATION DATE 2.1 Percentage of applications for foreign nationals corporate and individual work visa processed within 30 working days 70% complete applications for foreign nationals corporate and individual work visa processed within 30 working days NOT ACHIEVED 44% (82 of the 187) were processed within 30 working days. Variance is -26% Delays in the verification process of the applicants information Implement improvement plans during third quarter. Prov Total Processed Processed within 30 working days % processed within 30 working days Processed beyond 30 working days No. of workers applied  No. of workers negative EC 14 13 93% 1 3 11 FS 2 0% GP 68 23 35% 46 941 KZN 12 10 83% LP *21 62% 8 3 264 1 162 2102 MP *17 47% 9 788 622 166 NC *4 75% 153 151 NW 33% WC *46 22% 36 465 365 100 Total 187 82 44% 105 5 642 2 304 3 339 * Include Corporate Visa application involving large number of workers

52 PUBLIC EMPLOYMENT SERVICES
PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION AND IMPLEMENTATION DATE 2.1 Percentage of applications for foreign nationals corporate and individual work visa processed within 30 working days 70% complete applications for foreign nationals corporate and individual work visa processed within 30 working days PARTIALLY ACHIEVED 68% (127 of the 187) were processed within 30 working days. Variance is 2% Delays in the verification process of the applicants information Implement improvement plans during third quarter. Prov Total Processed Processed within 30 working days % processed within 30 working days Processed beyond 30 working days No. of workers applied  No. of workers negative EC 14 100% 3 11 FS 2 GP 68 46 68% 22 941 1 940 KZN 12 92% LP *21 20 95% 3 264 1 162 2 102 MP *17 10 59% 7 788 622 166 NC *4 75% 153 151 NW 33% WC *46 43% 26 465 365 101 Total 187 127 60 5 642 2 304 3 339

53 PROGRAMME 4 LABOUR POLICY AND INDUSTRIAL RELATIONS

54 LABOUR POLICY & INDUSTRIAL RELATIONS (LP & IR)
PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION Strategic Goal 10: Promote Equity in the Labour Market (OUTCOME 14: TRANSFORMING SOCIETY AND UNITING THE COUNTRY) 1.1 Number of policy instruments developed and promoted to enhance the implementation of EEA by 31 March 2017 Draft Amended Code of Good Practice on preparation and implementation of EE Plans published for public comment by 30 September 2016 ACHIEVED Draft Amended Code of Good Practice on preparation and implementation of EE Plans published for public comments under: Government Gazette No on 30 September   None Conduct 13 workshops on amended Code of Good Practice on Employment of Persons with Disabilities by 30 September 2016 Conducted 13 workshops with stakeholders in 9 Provinces on amended Code of Good Practice on Employment of Persons with Disabilities

55 LABOUR POLICY & INDUSTRIAL RELATIONS (LP & IR)
PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION Strategic Goal 3: Protect Vulnerable Workers (Outcome 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH 2.1 Number of sectoral determinations reviewed per year Promulgation of Hospitality and Taxi SDs by end June 2016 Achievement of Hospitality SD promulgation was reported in the first quarter Promulgation of Taxi SD took place in July 2016 The target for 2016/17 achieved Although there is no target for Q2 this work was finalised in July 2016. Strategic Goal 4: Strengthen multilateral and bilateral relations 3.1 Strengthen and monitor implementation of bilateral agreements that are in line with national priorities within set time frames Mid-term implementation report submitted by 30 September 2016 ACHIEVED Report finalized and submitted on 15 September 2016 None

56 LABOUR POLICY & INDUSTRIAL RELATIONS (LP & IR)
PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION Strategic Goal 6: Promote sound labour relations (Outcome 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH )   4.1 Percentage of collective agreements extended within 90 calendar days of receipt by 31 March  100% NOT ACHIEVED 20% (100% depends on the number of agreements received) 10 received Only 2 processed within 90 calendar days (20%) % out of 90 calendar days = (80%) Competent (missing) documentation for the 8 agreements were not submitted before the 90 calendar days starts. No response from the councils after follow ups were done. Intention to amend LRA to amend the delegation of powers to fast track processes. Establish appropriate time frame that each official should not exceed in value chain.

57 LABOUR POLICY & INDUSTRIAL RELATIONS (LP & IR)
PROGRAMME PERFORMANCE INDICATOR QUARTER 2 TARGET ACTUAL PERFORMANCE REASON FOR VARIANCE REMEDIAL ACTION Strategic Goal 6: Promote sound labour relations (Outcome 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH )   4.2 Percentage of labour organisation applications for registration approved or refused within 90 calendar days of receipt by end of March 100% ACHIEVED 27 received APPROVED Actual approved within 90 days: 23 % approved within 90 days: 85% REFUSED Actual refused within 90 days: 4 % refused within 90 days: 15% Total : 100%

58 CONCLUSION In 2015/16 the Department’s performance was at 47% in Quarter 1. In 2016/17 it started off at 62% for Quarter 1 and Performance for Quarter 2 has improved to 69%. Performance for Quarter 2 in the previous financial year 2015/16 was 58%. The Department has committed to improve its performance and service delivery in 2016/17. Monthly monitoring of performance has been instituted with monthly reports to the monthly monitoring and evaluation steering committee. Monthly reports will be drawn from each Labour Centre and will be consolidated into Provincial and Branch Monthly reports to be deliberated at HO level by the M&E Steerco. The Steerco is chaired by the Acting COO and reports monthly to EXCO chaired by the DG. This will serve as an early warning and enabler to the implementation of the Annual Performance Plan. There is a commitment to maintain a higher level of performance in this financial year with consequences for non-performance.

59 Thank You…


Download ppt "THE DEPARTMENT OF LABOUR QUARTER 1 and 2 PERFORMANCE REPORT"