Download presentation
Presentation is loading. Please wait.
1
CASE 3: Multistory Building
Wall elements VIA / TCU 5th semester workshop A2018 VIA University College TCU-VIA Workshop – A2016 1
2
CASE 3: Multistory Building
Wall elements and roof VIA / TCU 5th semester workshop A2018 VIA University College TCU-VIA Workshop – S2016 2
3
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 Wooden wall elements combined with heavy internal or external walls VIA University College 3
4
CASE 3: Multistory Building
Wooden elements CASE 3: Multistory Building VIA / TCU 5th semester workshop A2018 External walls made out of wood normally consist of a frame with insulation between the studs. Inside with a dpm and a covering consisting of boards. Examples of internal cladding fixed from the factory could be: Wood wool cement boards Plywood Plasterboard Fibergypsum board Hardboard Chipboard Furring for later fixing of boards after erecting the facade elements The choice of boards will depend of different factors.It could be fire-, moisture-, stability-, or sound. VIA University College 4
5
CASE 3: Multistory Building
Placement of external horizontal and vertical cladding VIA / TCU 5th semester workshop A2018 VIA University College 5
6
CASE 3: Multistory Building
Flashing on top of the window VIA / TCU 5th semester workshop A2018 VIA University College 6
7
CASE 3: Multistory Building
Placement of window sill made out of steel/zinc. VIA / TCU 5th semester workshop A2018 VIA University College 7
8
CASE 3: Multistory Building
Roof elements VIA / TCU 5th semester workshop A2018 Wooden element What is a roof element? It is a prefabricated building component with semi finished roof, insulation and finished ceiling. Where is it used? Very often used for industrial-, office-, and dwelling buildings. Wooden roof elements can be used at all roof angles or produced with the slope from the factory. VIA University College TCU-VIA Workshop – S2016 8
9
CASE : Multistory Building
Damp proff membranes Roof elements VIA / TCU 5th semester workshop A2018 Unventilated roof elements is much more sensitive for the moisture condition when building. If a Hygrodiode membran is used as dpm any moisture in the element will be driven to the dpm where it condensates if the sun shines. Remember that the consultants must secure that no moisture will enter into the element while mounting. You must describe to: - Deliver the elements with the first layer of bitumen fixed. Place a bitumen felt strip following the mounting sequence During night seal the elements Hygrodiode PVC-foil VIA University College 9
10
CASE : Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 10
11
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 11
12
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 12
13
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 13
14
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 14
15
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 15
16
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 16
17
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 17
18
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 18
19
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 19
20
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 20
21
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 21
22
CASE 3: Multistory Building
VIA / TCU 5th semester workshop A2018 VIA University College 22
23
CASE 3: Multistory Building
Concrete Balconies VIA / TCU 5th semester workshop A2018 VIA University College 23
24
CASE 2: Multistory Building
VIA University College 24
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.