Presentation is loading. Please wait.

Presentation is loading. Please wait.

ME 280 Lab Final Project Begins March 26th for sections 4 and 5, and March 30th for sections 2 and 3 Due April 21st for sections 4 and 5 and April 22nd.

Similar presentations


Presentation on theme: "ME 280 Lab Final Project Begins March 26th for sections 4 and 5, and March 30th for sections 2 and 3 Due April 21st for sections 4 and 5 and April 22nd."— Presentation transcript:

1 ME 280 Lab Final Project Begins March 26th for sections 4 and 5, and March 30th for sections 2 and 3 Due April 21st for sections 4 and 5 and April 22nd for sections 2 and 3

2 100 points total 15 points Return project assembled and functioning 15 points Freehand sketches of all components 30 points Project presentation 40 points Assembly modeling

3 Group Grading: Each member will grade the other members contribution to the project. You can lower a grade as much as 25 points but you cannot raise it.

4 Each student will model their own components and save them in their team folder
Each group will have about 8 minutes to present their project This is a formal presentation DO NOT wait for a group member

5 You must turn in a complete, functioning assembly to receive the 15 points
Assembly constraints will be tested during the presentation Each group will present at least one exploded view, with trace lines, of their project


Download ppt "ME 280 Lab Final Project Begins March 26th for sections 4 and 5, and March 30th for sections 2 and 3 Due April 21st for sections 4 and 5 and April 22nd."

Similar presentations


Ads by Google