Download presentation
Presentation is loading. Please wait.
1
IEEE 802.21 MEDIA INDEPENDENT HANDOVER
DCN: Title: , Session #34, Big Island Closing Report Date Submitted: September, 2009 Presented at IEEE session #34 Big Island Authors or Source(s): Vivek Gupta Abstract: Closing Report
2
IEEE 802.21 presentation release statements
This document has been prepared to assist the IEEE Working Group. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE The contributor is familiar with IEEE patent policy, as outlined in Section 6.3 of the IEEE-SA Standards Board Operations Manual < and in Understanding Patent Issues During IEEE Standards Development
3
Sept Big Island Interim Meeting Updates
Task Group Update PAR Updates Teleconference update Liaison update (802.11, , IETF) Future Locations
4
802.21 Task Group Reports 802.21a Security Task Group
Proposal discussion Down selection procedure for Nov is rescinded 802.21b Broadcast Handovers Task Group Initial Proposal presentation
5
802.21 PAR Update 802.21 Single Radio Handover PAR
Approved and to be forwarded to 802EC for consideration in Nov-2009 meeting MRPM PAR Good discussion with Cisco, feedback being incorporated Use case document being prepared 15 day WG LB authorized to vote on this PAR for consideration during Nov 802EC meeting => Documents not available in time and hence LB rescinded
6
Teleconferences 802.21 a Teleconferences Oct-15 : 10 AM ET
Oct-29 : 10 PM ET
7
Liaisons Liaison to FMCA Gideon Reid is no longer with BT/FMCA
Liaison no longer applicable
8
3GPP-CT1 Update Contribution: C captures decision on choice of communication protocol between UE and ANDSF Presented at 3GPP CT1-55 Aug-2008 Ericsson, Infineon, ZTE, Nokia, Nokia Siemens Networks, Vodafone, Qualcomm, NTT DOCOMO, Telia Sonera, Research In Motion, Motorola, Verizon ~ 40 votes with major operators Prefer OMA as opposed to Contribution C presents Overview of Presented at 3GPP CT1-54 June-2008 Intel, Telcordia, Toshiba America Research, InterDigital, Panasonic, BT 6 votes Support for
9
WG Motions
10
Single Radio Handovers PAR/5C Motion
Motion the WG to approve the PAR and 5C as described in document SingleRadioHandovers-Par-5c.doc and submit it to 802EC for further consideration in Nov-2009 meeting By: Shubhranshu Singh Second: Anthony Chan Yes: 6 No: 0 Abstain: 1 Result: Motion Passes
11
MRPM Letter Ballot Motion
Having resolved issues and updated MRPM PAR/5C as mrpm-mrpm-revised-par-5c, Approve a 15 day WG Letter Ballot asking the procedural question “Should the MRPM PAR/5C, mrpm-mrpm-revised-par-5c be forwarded to the IEEE 802 LMSC Executive Committee for its approval in Nov-2009?” Moved: Junghoon Jee Seconded: Anthony Chan Yes: No: Abstain: 3 Motion Passes
12
Future Sessions
13
Future Sessions Plenary: Nov 15-20, 2009, Hyatt Regency, Atlanta, GA Co-located with all 802 groups
14
Future Sessions - 2010 Interim: Jan, 2010 Location San Diego- La Jolla
Meeting co-located with Plenary: March 14-19, 2010, Caribe Royale, Orlando Co-located with all 802 groups Interim: May, 2010, Bangalore India Plenary: July 11-16, 2010, Manchester Grand Hyatt, San Diego, CA Interim: Sept, 2010 Location TBD Plenary: Nov 7-12, 2010, Hyatt Regency, Dallas, Texas
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.