Download presentation
Presentation is loading. Please wait.
Published byAbner Burke Modified over 5 years ago
1
Updating of Methodological Guidance on Art. 6(3)&(4)
NADEG meeting 22/5/2018 Fotios Papoulias DG Environment, Nature Protection unit
2
Background Guidance document published in 2002, covering
general process and concepts, screening, AA (information, impact prediction, COs, mitigation), alternatives, compensation, review package AP – under Action 1: “Update the methodological guidance on Article 6(3) and 6(4) of the Habitats Directive on the permitting requirements for plans and projects likely to have a significant effect on Natura 2000 sitess, also addressing issues relevant for the Projects of Common Interest (PCI) under the Trans-European Transport and Energy Networks (TEN-T/TEN-E)” Contract signed for technical support (contractor: adelphi, partner ATECMA)
3
Key tasks Review current guidance and identify elements for updating/completion (scoping), on the basis of: Findings of Fitness Check (i.a. strategic planning, early screening, streamlined environmental assessments, cost- effective approaches) Evaluation of EU Court of Auditors, Sectoral guidance documents, Literature, Jurisprudence Consultation of MSs & stakeholders/practitioners Case studies Proposal for updating, in consultation with MSs/stakeholders (incl. NADEG, CGBN) Final output: Revised guidance, with examples (and video) Translations and promotion/dissemination events
4
Consultation Aim: identify key issues and challenges related to the assessment and permitting procedure under Art. 6(3) & (4) Target groups: MS authorities, economic sectors, NGOs, practitioners Topics covered: Methods/tools on main steps in Art. 6(3) & (4) process (screening, AA, cumulative effects, decision-making, alternatives, IROPI, compensation) Knowledge/information sources, capacity/skills, coordination/streamlining, strategic planning – AA of plans, consultation/dialogue Use of currrent guidance / suggestions Good practices Timeframe: Questionnaire sent out 16/4, replies by 31/5
5
Work planning Ongoing: scoping and consultation phase (coordination with species and wind-farm guidance) September 2018: first draft updated guidance document 29- 30/10/2018: Ad-hoc NADEG meeting November 2018: Possible additional written comments - revision End 2018: Final draft Early 2019:Adoption by Commission
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.