Presentation is loading. Please wait.

Presentation is loading. Please wait.

ECE 477 Design Review Team ??  Fall 2012

Similar presentations


Presentation on theme: "ECE 477 Design Review Team ??  Fall 2012"— Presentation transcript:

1 ECE 477 Design Review Team ??  Fall 2012
Paste a photo of team members here, annotated with names of team members.

2 Outline Project overview Project-specific success criteria
Block diagram Component selection rationale Packaging design Schematic and theory of operation PCB layout Software design/development status Project completion timeline Questions / discussion

3 Project Overview

4 Project-Specific Success Criteria
Edit in your PSSC #1 Edit in your PSSC #2 Edit in your PSSC #3 Edit in your PSSC #4 Edit in your PSSC #5

5 Block Diagram

6 Component Selection Rationale

7 Packaging Design

8 Schematic/Theory of Operation
duplicate this slide as necessary for each major block of your design

9 PCB Layout duplicate this slide as necessary for each major block of your design

10 Software Design/Development Status

11 Project Completion Timeline

12 Questions / Discussion


Download ppt "ECE 477 Design Review Team ??  Fall 2012"

Similar presentations


Ads by Google