Download presentation
Presentation is loading. Please wait.
1
Total Maximum Daily Loads
High Rock Lake & Total Maximum Daily Loads
2
Today’s Agenda Introduction to Use-Support Methodologies and High Rock Lake TMDL Process Scoping Study Future Efforts Q & A Courtesy CWRC
3
Basinwide Planning Program
Applies to All 17 River Basins
4
Use Support Methodology
Aquatic Life Recreation Drinking Water Based on Stream Classification
5
Use Support Methodology
Standards Chl a, pH, Dissolved Oxygen, etc. Aquatic Life Standards Met = Supporting Standards Not Met = Impaired Inconclusive Data = Not Rated No Data
6
Current Data (2003 Basin plan)
7
Current Data (2003 Basin plan)
8
High Rock Lake – Monitoring History
1974 – 1975 : EPA & DWQ determine nutrient enrichment. 1981 : UNC-CH documents elevated nutrients and chlorophylla concentrations 1989 – 1990 : DWQ intensive study 1992 – 1997 – 2002 : DWQ basinwide sampling.
9
Model History Early 1990’s : BATHTUB model Good loading information
Estimate nutrient loads Determine Assimilative capacity Develop predictive tool Good loading information Good Phosphorous Prediction Poor Chla prediction Not Sufficient for TMDL purposes
10
Current Data (2003 Basin plan)
High rock map
11
High Rock Lake Impairment
Upper Lake Turbidity Low Dissolved Oxygen Chla
12
High Rock Lake Impairment
Lower Lake Turbidity
13
High Rock Lake Impairment
Abbots Creek Turbidity Low Dissolved Oxygen
14
High Rock Lake Impairment
Second Creek Lake Arm NOT IMPAIRED Upstream is impaired : aquatic life
15
Everyone has an impact; Everyone must be part of the solution.
Water quality management is a shared responsibility.
16
Basinwide Planning Program Website http://h2o. enr. state. nc
Basinwide Planning Program Website or call
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.