Download presentation
Presentation is loading. Please wait.
1
Quiz 2 Start the Stage 3 Quiz
2
Question 1 Is the User POC required to walkthrough the generated Smart Hub?
3
Question 1 Is the User POC required to walkthrough the generated Smart Hub? Wrong Answer Go Back
4
Question 1 Correct Answer
Is the User POC required to walkthrough the generated Smart Hub? Correct Answer Next Question
5
Question 2 Is the User POC required to collaborate with other Hubs?
6
Question 2 Is the User POC required to collaborate with other Hubs? Wrong Answer Go Back
7
Question 2 Correct Answer
Is the User POC required to collaborate with other Hubs? Correct Answer Next Question
8
Question 3 Is the User POC required to modify/extend the initial Hub in Stage3?
9
Question 3 Is the User POC required to modify/extend the initial Hub in Stage3? Wrong Answer Go Back
10
Question 3 Correct Answer
Is the User POC required to modify/extend the initial Hub in Stage3? Correct Answer Finished
11
Thanks
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.