Download presentation
Presentation is loading. Please wait.
1
STF430 Final Report Summary
Gyorgy Rethy STF Leader
2
Project details 7 ETSI member supported the STF
– (78 mDays, all used up) Members: Gyorgy Rethy, Ericsson Jens Grabowski, University of Goettingen Ina Schieferdecker, Fraunhofer FOKUS Jacob Wieland, TestingTech Sessions 24–27 May 2011 27 June–01 July 2010 26–30 September 2010 28 November–02 December 2010
3
Scope - 1 Maintenance and new features, existing standards, ES 201 873
TTCN-3 Part-1: Core Language V4.3.1 TTCN-3 Part-4: Operational Semantics V4.2.1 TTCN-3 Part-5: TTCN-3 Runtime Interface V4.3.1 TTCN-3 Part-6: TTCN-3 Control Interface V4.3.1 TTCN-3 Part-7: Using ASN.1 with TTCN-3 V4.3.1 TTCN-3 Part-8: Using IDL with TTCN-3 V4.3.1 TTCN-3 Part-9: Using XML with TTCN-3 V4.3.1 TTCN-3 Part-10: TTCN-3 source code doc. V4.3.1
4
Scope - 2 New Extension packages
Maintenance and new features, existing extension packages ES TTCN-3 Extension: Configuration and deployment V1.1.1 ES TTCN-3 Extension: Real-Time and Performance Testing V1.1.1 ES TTCN-3 Extension: Advanced Parameterization V1.2.1 ES TTCN-3 Extension: Behaviour Types V1.2.1 New Extension packages TTCN-3 extension: Continuous Signal support TTCN-3 extension: Advanced TRI
5
Interim version TTCN-3 Part-1: Core Language V4.3.2
24 CRs resolved and included See list of CRs in TD MTS(11)0056 TTCN-3 Part-9: Using XML with TTCN-3 V4.3.2 9 CRs resolved and included
6
Final deliverables -1 ES 201 873 TTCN-3 Part-1: Core Language V4.4.1
46 CRs resolved and implemented (in addition to the interim version) TTCN-3 Part-4: Operational Semantics V4.4.1 no “own” CR, synchronization with the other parts TTCN-3 Part-5: TTCN-3 Runtime Interface V4.4.1 2 CRs resolved and implemented TTCN-3 Part-6: TTCN-3 Control Interface V4.4.1 8 CRs resolved and implemented TTCN-3 Part-7: Using ASN.1 with TTCN-3 V4.4.1 1 CR resolved and implemented TTCN-3 Part-8: Using IDL with TTCN-3 V4.4.1 TTCN-3 Part-9: Using XML with TTCN-3 V4.4.1 12 CRs resolved and implemented (in addition to the interim version) TTCN-3 Part-10: TTCN-3 source code doc. V4.4.1 All parts have been delivered, AbC introduced on 19th Dec. 2011 See detailed CR list at
7
Final deliverables -2 Existing extension packages
TTCN-3 Extension: Configuration and deployment No CR resolved (1 CR pending) TTCN-3 Extension: Real-Time and Performance Testing No CR received TTCN-3 Extension: Advanced Parameterization TTCN-3 Extension: Behaviour Types New extension packages TTCN-3 extension: Continuous Signal support Delivered (TD MTS(12)000001) TTCN-3 extension: Advanced TRI Delivered (TD MTS(12)000002)
8
Other TTCN-3 User Conference 3GPP TB MTS
Presentation has been held at the TTCN-3 User Conference 2011 in Bled („ TTCN-3 Language Maintenance and Evolution“) 3GPP During its sessions, STF430 has participated on STF160‘s regular phone meetings with TTCN-3 tool vendors Continous contact and discussions via and direct phone calls with STF 160‘s experts TB MTS The STF‘s work progres was reported on MTS#54, October 2011, Tallin (TD MTS(11)0055) STF work (list of resolved and progressed CRs) is sent on the MTS-GEN mailing list
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.