Presentation is loading. Please wait.

Presentation is loading. Please wait.

2012 History Foundation of “Oka-Polymer” industrial park

Similar presentations


Presentation on theme: "2012 History Foundation of “Oka-Polymer” industrial park"— Presentation transcript:

1

2 2012 History Foundation of “Oka-Polymer” industrial park 2012 2009
2007 2000 1994 1982 1966 1936 foundation of “Oka-Polymer” industrial park Assembly line of cable plastics “Ermafa” has been launched The program concerning decomissioning of process units, buildings and structures, previously closed in 1980s and 1990s has been launched. 154 units, including 20 high-rise buildings have been dismantled within two years. 40,5 hectares of land in the central part of the plant and 54 hectares in the eastern have been cleaned in order to launch new investment projects Acquisition of Caprolaсtam plant by “SIBUR-Neftekhim”, OJSC Foundation of “Kapella” -- one of the first industrial joint ventures in Nizhny Novgorod region Caprolactam production closure “Caprolactam” chemical plant + start of caprolactam production Foundation of plant No96 (“Zavodstroy”)

3 Excellent transport location
Supported by Nizhny Novgorod region’s government Excellent transport location 1 100 km Federal road M7 Moscow-Ufa Gorky railway 500 m away from the Park 400 km International airport “Nizhny Novgorod” – 20 km away 370 km Center of river Volga navigation in Nizhny Novgorod

4 84 43 3,28 Excellent location of workforce Mln of population
Supported by Nizhny Novgorod region’s government Excellent location of workforce 84 Mln of population Within 1000 km 43 Mln of population Within 500 km 3,28 Mln of population In Nizhny Novgorod region

5 1 2 3 4 5 Location – Dzerzhinsk, known as “the city of chemists”
Supported by Nizhny Novgorod region’s government Location – Dzerzhinsk, known as “the city of chemists” DZERZHINSK TODAY 1 2 3 Population – 240 thousand people City’s economy is based on industry Attractive investment climate: more than 13,3 bln roubles have been invested in 2014 4 5 Scientific and technical background – graduates of numerous institutes of higher education – Nizhny Novgorod state University, Technical University, Architects University, numerous vocational educational establishments Located on the embankment of navigable Oka river

6 300 350 Infrastructure thousand м2 Hectares
OKA-POLYMER INDUSTRIAL PARK Purpose-designed area, where location of various chemically-oriented production is possible: Chemical and petro-chemical Car spare parts production Plastic goods Metallurgy production 57,8% 12,5% 29,6% 300 350 Hectares thousand м2 Total territory of the Industrial park Total area of buildings and structures

7 Mapping of Oka-Polymer industrial park
As of today – 39 residents

8 Energy and engineering infrastructure
Park’s resources Electricity 280 megawatt Natural gas м3/hour Technical water м3/hour Heat Waste Steam: 315 Gcal/hour Industrial: м3/hour Heated water: 50 Gcal/hour Utility: м3/hour Auto transportation hard-surface road: 29 km Railway transportation “Promyshlennaya” station: 200 train cars/day

9 Services for park residents
The services are divided into permanent and additional Permanent: Additional: Security Access control Design services Roads maintenance Territory lighting Catering Territory maintenance: territory sweeping, snow removal, garbage removal Personnel transportation

10 Government support Governor’s Valeriy Shantsev meeting at “Oka-Polymer” industrial park

11 1 2 3 4 Government support of investment activity
Organizational, informational (publicity), and legal support Provision of Nizhny Novgorod region state guarantees under investment projects (on competition basis) 3 4 Tax holiday for corporate property, created or acquired during project execution, for the organization which carries investment activity Lowered tax on income, received from project execution, and assignments to budget in the amount of 13,5% From 100 till 500 mln RUR — 4 taxation periods From 500 mln RUR and more — 5 taxation periods Under 100 mln RUR — 2 years From 100 mln till 500 mln RUR — 4 years From 500 mln RUR and more — 5 years

12 Key events: launch of production
Thirty seven residents are located in the industrial park as of May, The amount of announced investments to launch new production capacities is more than 4,9 bln RUR. Our residents: OJSC “Sibur-Neftekhim” LLC “Boryszew Prlastic Rus” The object is being rented. Ethylene oxide, ethylene-glycole, acryl acids, and ethers production in Russia The object is owned. Car components production LLC “Intellektualnye Sistemy NN” LLC “Clarity” The object is owned. Polyethylene film production The object is owned. Electrooptics and solid-state lasers production

13 Yes or yes? Thank you for your attention!


Download ppt "2012 History Foundation of “Oka-Polymer” industrial park"

Similar presentations


Ads by Google