Presentation is loading. Please wait.

Presentation is loading. Please wait.

Submission Title: [TGn Liaison Report] Date Submitted: [17Nov2005]

Similar presentations


Presentation on theme: "Submission Title: [TGn Liaison Report] Date Submitted: [17Nov2005]"— Presentation transcript:

1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [TGn Liaison Report] Date Submitted: [17Nov2005] Source: [John Barr] Company [Motorola] Address [1303 E. Golf Road, Schuamburg, IL 60196] Voice:[ ], FAX: [ ], Re: [] Abstract: [Liaison report to inform WG of actions taken by n.] Purpose: [Information Exchange] Notice: This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by July 2004 doc.: IEEE /0395r0 Dr. John R. Barr, Motorola John Barr, Motorola

2 July 2004 doc.: IEEE /0395r0 Summary Joint proposal NOT completed by November 7th deadline. About 75% complete. Task Group agreed to continue joint proposal effort outside of IEEE process until January meeting. Confirmation vote on the joint proposal should occur in January. Dr. John R. Barr, Motorola John Barr, Motorola

3 Recap of Architecture Encoder Puncturer Parser Interleaver QAM Mapper
Antenna Mapper iFFT Window & GI RF Pilot Preamble Agreed upon Under discussion Yet to be discussed Dr. John R. Barr, Motorola

4 Current PHY Proposal r2 Joint Proposal PHY specification has been posted to 802wirelessworld. Sean Coffey – PHY Editor 30 pages Approximately 75% complete Dr. John R. Barr, Motorola

5 Previous MAC Feature Architecture
July 2004 doc.: IEEE /0395r0 Previous MAC Feature Architecture Dr. John R. Barr, Motorola John Barr, Motorola

6 Current MAC Feature Architecture
July 2004 doc.: IEEE /0395r0 Current MAC Feature Architecture Dr. John R. Barr, Motorola John Barr, Motorola

7 Current MAC Proposal 11-05/1095r2 Joint Proposal MAC Specification has been posted to 802wirelessworld Adrian Stephens – MAC editor 37 pages Approximately 75% complete Dr. John R. Barr, Motorola

8 Joint Proposal Timeline
Hawaii Final Joint Prop Confirm Vote Draft Owned by TGn F2F San Fran F2F Anaheim F2F Vancouver F2F JAP F2F EUR F2F Weekly Conference Calls between F2F Meetings JUL AUG SEP OCT NOV DEC JAN 2005 2006 Dr. John R. Barr, Motorola

9 Resolved to complete by Jan 2006
Moving Forward MAC and PHY are ~ 75% complete Open specification issues have been identified and are being resolved Technical investigations are largely complete Continuous decision-making telecon, , web-based balloting Consensus-building is accelerating Resolved to complete by Jan 2006 Dr. John R. Barr, Motorola

10 TG11n Motion to Continue JP
Move to continue the time to complete the merger of MITMOT, TGn Sync and WWiSE proposals through the end of the interim session Jan 2006. Passed by unanimous consent Dr. John R. Barr, Motorola

11 Primary Documents 05-1051 r0 JP Opening Report
July 2004 doc.: IEEE /0395r0 Primary Documents r0 JP Opening Report r2 JP MAC Specfication r2 JP PHY Specification r0 JP PHY Presentation r1 JP MAC Detail r1 TGn Opening Report r0 TGn September Minutes r1 TGn JP Closing Report Dr. John R. Barr, Motorola John Barr, Motorola


Download ppt "Submission Title: [TGn Liaison Report] Date Submitted: [17Nov2005]"

Similar presentations


Ads by Google