Fred’s Input to Rice Workshop
19-April-05 Fred’s Input to Rice Workshop Prepared by Fred Borcherding FNAL 7-Jan-2009 Rice Workshop by Fred B.
2
19-April-05 What we need For EMU and CMS an up to date list of boards with numbers of installed, ready spares, under repair, other spares A systematic way of obtaining the above information from ‘electronics’ db For each board type do we have Test stand fixture Test stand expert Test stand procedures Repair facility 7-Jan-2009 Rice Workshop by Fred B.
3
Electronics db Electronics Data Base Jobs Electronics Data Bases
19-April-05 Electronics db Electronics Data Base Jobs Is the information in each db current? Do we need an inventory? Have consistency checks been conducted on each db? Who maintains db now and in the future? db programming db entries Electronics Data Bases Chamber db Contains all chambers, location, fast site info Oracle db On-chamber electronics db Contains all on-chamber boards Off-chamber db Contains pcrate boards, FED, TF, LV and HV crates and boards Presently in spreadsheet form Moving to Oracle DB (Vadim at UTA) CMS EMDB Official CMS Electronics db Snapshot of present UXC and USC cratess and boards Linked to each sub-detector electronics db Linked to chamber db, oracle db, NOT linked to off-chamber, but planned Has history of slots > requested by CSC Others 7-Jan-2009 Rice Workshop by Fred B.
4
CMS EMDB Screen shot of db 7-Jan-2009 Rice Workshop by Fred B.
19-April-05 CMS EMDB Screen shot of db 7-Jan-2009 Rice Workshop by Fred B.
5
Status of Electronics > Installed
19-April-05 Status of Electronics > Installed Status of Electronics > Installed / Total at CERN / Good Spares Status of Crates and boards, how many are needed, how many are at CERN and how many are good spares The following few slides are included for completeness 7-Jan-2009 Rice Workshop by Fred B.
6
19-April-05 On-Chamber Boards CSC On-chamber Electronics Boards installed /total /spares CFE xxxxx CFEB one type, 5(4) per chamber /?? /19 ALC xxxxx ALCT ME1_1 72 /?? / ?? ALC xxxxx ALCT288 ME1_3 72 /?? /10 ALC xxxxx ALCT384 ME1_2, ME234_2 214/?? /11 ALC xxxxx ALCT672 ME2_1, ME3_1, ME4_1 108 /?? /4 ALM xxxxx ALCT_MEZ one type, 1 per chamber 468 /?? /?? LVD xxxxx LVDB one type, 1 per chamber 468 /?? /?? LVM xxxxx LVMB one type, 1 per chamber 468 /?? /?? AFE xxxxx AFEB one type, many per chamber ?? /?? /?? NOTE: Have ~18 spare chambers, each with full complement of on-chamber boards – these are not in the sums above 7-Jan-2009 Rice Workshop by Fred B.
7
19-April-05 LV & PCRATE CSC LV Power Supplies > Wiener Maraton System, Air Cooled installed /total /spares PFCB LVPS xxxx OPFC Bin (Crate) 6 /8 /2 PFCM LVPS xxxx OPFC Module 36 /40 /4 MARS LVPS xxxx Maraton Supply 36 /40 /4 MARC LVPS xxxx Maraton Crate 36 /38 /2 Peripheral Crate, pcrate, Components installed /total /spares EMUPC PC xxxx pcrate crate 75 /60 /15 CBP PC xxxx pcrate back plane 70 /60 /10 CRB PC xxxx pcrate regulator brd 88 /60 /28 PCM PC xxxx PCMB /60 /19 ELM PC xxxx ELMB on PCMB 79 /60 /19 Pcrate boards installed /total /spares VCC PC xxxx Crate Controller 73 /60 /15 CCB PC xxxx Clock and Control 84 /60 /24 DMB PC xxxx DAQ Mother Brd /468 /82 MPC Trigger PC xxxx Muon Port Card 70 /60 /10 TMB Trigger PC xxxx Trig Mother Brd /468 /102 RAT Trigger PC xxxx RPC ALCT Trns /468 /222 7-Jan-2009 Rice Workshop by Fred B.
8
CSC HV HV ME1/1 > CAEN System installed /total /spares
19-April-05 CSC HV HV ME1/1 > CAEN System installed /total /spares Cc HV1 3052## Crate 2 /2 /0 Cc HV1 3052## Board 16 /18 /2 HV > UF Custom System installed /total /spares HV UF Custom System installed /total /spares HDS xxxxx Distribution /159 /33 HDL xxxxx Distribution /173 /29 HDC xxxxx Distrib Crate 30 /34 /4 HDP xxxxx Distrib Patch 8 /9 /1 HMB xxxxx Master board 40 /48 /8 HMC xxxxx Master Crate 8 /10 /2 HPS xxxxx Primary HV src 8 /10 /2 HCC xxxxx Control comp 2 /3 /1 HLV xxxxx LV power supply 2 /3 /1 HMP xxxxx Master Patch 2 /1 /3 HLP xxxxx LV patch panel 2 /4 /2 HCP xxxxx Control patch 2 /4 /2 HPC xxxxx Primary HVPS ctr 2 /3 /1 (spare parts) 7-Jan-2009 Rice Workshop by Fred B.
9
CSC Track Finder CSC TF installed /total /spares
19-April-05 CSC Track Finder CSC TF installed /total /spares CCC Trigger TF U CAEN VME 1 /3 /1 0 Trigger TF wiener crate ( trigger) 1 /2 /1 0 Trigger TF TF backplane 1 /3 /2 DDU Trigger TF DDU /2 /1 DDE Trigger TF DDU extender 1 /3 /1 TSP Trigger TF SP /17 /2 CCB Trigger TF CCB /3 /1 0 Trigger TF muon sorter /5 /3 7-Jan-2009 Rice Workshop by Fred B.
10
CSC FED 7-Jan-2009 Rice Workshop by Fred B. 19-April-05
FED Crates > Wiener 9U VME installed /total /spares FED FED FED Crate 4 /4 /0 (1 sp PS) FED Boards > OSU Custom Brds installed /total /spares CVC FED CAEN 6U CC 4 /5 /1 One sent to CAEN for repair, good spare is loan from pool DCC FED Clock and Control 4 /6 /2 2 more to be shipped to CERN DDU FED Data Board /?? /?? Pcrate Network > GBit installed /total /spares GNS GIG GBit Ethernet switch 8 /10 /2 (1 sp installed) 7-Jan-2009 Rice Workshop by Fred B.