Presentation is loading. Please wait.

Presentation is loading. Please wait.

Workreport.

Similar presentations


Presentation on theme: "Workreport."— Presentation transcript:

1 workreport

2 X,Y,Z value(MC truth) X value(Fit) Y value(Fit) Z value(Fit) (1.0,-1.0,2.0) (1.1,-1.1,2.6) (1.2,-1.2,3.2) (1.3,-1.3,3.8) (1.4,-1.4,4.4) (1.5,-1.5,5.0) (1.6,-1.6,5.6) (1.7,-1.7,6.2) (1.8,-1.8,6.8) (1.9,-1.9,7.4) (2.0,-2.0,8.0)

3 X axis: X value(MC truth)
Y axis: X value(Fit) - X value(MC truth)

4 X axis: Y value(MC truth)
Y axis: Y value(Fit) - Y value(MC truth)

5 X axis: Z value(MC truth)
Y axis: Z value(Fit) - Z value(MC truth)

6 X,Y,Z value(MC truth) X value(Fit) Y value(Fit) Z value(Fit) (1.0,-1.0,2.0) (1.1,-1.1,2.6) (1.2,-1.2,3.2) (1.3,-1.3,3.8) (1.4,-1.4,4.4) (1.5,-1.5,5.0) (1.6,-1.6,5.6) (1.7,-1.7,6.2) (1.8,-1.8,6.8) (1.9,-1.9,7.4) (2.0,-2.0,8.0)


Download ppt "Workreport."

Similar presentations


Ads by Google