Presentation is loading. Please wait.

Presentation is loading. Please wait.

BILLING UNIT JUNE 2012.

Similar presentations


Presentation on theme: "BILLING UNIT JUNE 2012."— Presentation transcript:

1 BILLING UNIT JUNE 2012

2 SALAH ATTACH BILLING SLIP
1)TSB HARUM MEGAH – PRISMA RSOURCES TEGUH SARJANA BUMI – PRISMA RESOURCES 2)TMN DAYA WONDERFUL COMPOUND – PPNJ 3)BBU WIN WIN FOOD – FLEXTRONICS TECHNOLOGY 4)PANDAN MULTI FIBRE – PINTARMAS SDN BHD INSTRUMENTS TECHNOLOGY – TOYOPLAS MANUFACTURING

3 SALAH REGISTER 1)BBU PROTON PARTS CENTRE (P260) - PROTON PARTS CENTRE(P2C)

4 HIGHLIGHTS *ASP – HANTAR SUMMARY ONLINE (TAMAN U & TUTA)
*IHP – HANTAR SUMMARY ONLINE (GELANG PATAH,P WANGSA, TMN GAYA, TMN RINTING,G PATAH) *MEDIJARING,PERKESO,MAJLIS BANDARAYA JOHOR BAHRU,I&P GROUP – BORANG MESTI LENGKAP


Download ppt "BILLING UNIT JUNE 2012."

Similar presentations


Ads by Google