1 Integration of Variable Generation Task Force (IVGTF)
Mark Lauby Manager, Reliability Assessments

2 About NERC The electric industry’s “self-regulatory organization” for reliability Balances the interests of all stakeholders Represents industry consensus Independently acts in the best interest of reliability International “charter” lending government support and oversight to SRO activities, ensuring that the best interests of society-at-large are represented Federally recognized “Electric Reliability Organization” in the U.S. Agreements in place with several Canadian provinces and developing these agreements in others 2

3 To ensure the reliability of the North American bulk power system
About NERC: Mission To ensure the reliability of the North American bulk power system Develop & enforce reliability standards Assess current and future reliability Analyze system events & recommend improved practices Encourage active participation by all stakeholders Pursue mandatory standards in all areas of the interconnection

4 2007 LTRA Report Operational challenges must be resolved
Integration of Wind & Solar Resources Require Special Considerations in Planning, Design, & Operation Operational challenges must be resolved Transmission needed to support renewable development “Clean Energy Superhighway” NERC to monitor federal carbon legislation for impact on reliability

5 NERC’s Actions Developed Integration of Variable Generation Task Force
Evaluate operational requirements Recommend standards. Develop a consistent approach for rating variable resources Available capacity at time of system peak Developed Integration of Variable Generation Task Force

6 Engaging Industry Experts
Integration must support a reliable bulk power system Variable Resources affect planning/operations Reviewed by the Operating & Planning Committees in December 2007 Integration of Variable Generation Task Force

7 IVGTF Scope The Task Force will prepare The document will include:
A concepts document that includes the philosophical and technical considerations for integrating variable resources Specific recommendations for practices and requirements, including reliability standards, that cover the planning, operations planning, and real-time operating timeframes. The document will include: Planning timeframe issues, such as contribution to reserve margins and modeling requirements to test system reliability, Operational Planning and Real-time operating timeframe issues, including Interconnection frequency, and primary and secondary generation control Review NERC Standards for any gaps Conclusions and recommendations.

8 IVGTF Guiding Principles
Bulk power system reliability must be maintained, regardless of the generation mix All generation must contribute to overall bulk power system reliability Standards and criteria established must be fair, transparent and performance-based Planners and operators must understand the challenges presented by large scale integration of variable generation Wind and other variable generation must effectively integrate into planning and operations practices to ensure reliability New Planning/operating tool requirements will be described in terms of bulk power system reliability performance

9 IVGTF Outline of White Paper
Characteristics of Variable Generation Planning and Technical Impacts System Operations Other and Future Considerations NERC Standard Review Conclusions & Recommendations Glossary

10 IVGTF Status High Industry Interest
30 Nominations received Liaisons being built with Industry Groups American Wind Energy Association (AWEA) Canadian Wind Energy Association (CanWEA) Utility Wind Integration Group (UWIG) Solar Energy Industries Association (SEIA) IEEE-PES EPRI U.S. Department of Energy Union for the Co-ordination of Transmission of Electricity (UCTE)

11 IVGTF Status: Work Plan
Item Goal Lead 2008 Milestones Conf. Call Review Report outline & assignments Lauby February OC/PC Status Report Frost & Lauby March Meeting Review assignments first drafts Task Force Review Second drafts May Status Report & preliminary findings June Review Final Draft Report August Present Final Draft Report Capacity Method Recommendations September Review OC/PC Comments & develop Final Report Present Final Report and recommendations December Meeting/ Workshop Open Meeting to Present results January, 2009