Download presentation
Presentation is loading. Please wait.
1
802.15 Liaison Report Date: 2011-03-18 Authors: March 2011
March 2011January 2009September 2008 January 2009September 2008 September 2008 doc.: IEEE /xxxxr0 March 2011 Liaison Report Date: Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
2
Abstract Liaison report on 802.15 as presented to 802.11 March 2011
September 2008 January 2009September 2008 March 2011January 2009September 2008 doc.: IEEE /xxxxr0 March 2011 Abstract Liaison report on as presented to Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
3
September 2008 March 2011January 2009September 2008 May 2008 January 2009September 2008 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 March 2011 Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
4
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 e MAC amendments First Recirculation WG ballot LB69 on D3.0 closed March 12, Results were 150/15/ % Affirmative 304 comments: 125 Technical, 175 Editorial, 4 General Resolved all comments Expecting to go out for second Recirculation WG ballot after draft is complete Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
5
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 f RFID First Recirculation WG ballot LB63 on D2.0 closed March 10, Results were 160/9/ % Affirmative: Passes 219 comments: 100 Technical, 117 Editorial, 2 General Resolved all comments Expecting to go out for second Recirculation WG ballot after draft is complete (April) Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
6
802.15.4g Smart Utility Networks
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 g Smart Utility Networks First Recirculation WG ballot LB67 on D3.0 closed March 8, Results were 160/22/ % Affirmative 545 comments: 264 Technical, 281 Editorial Resolved all comments Expecting to go out for second Recirculation WG ballot after draft is complete Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
7
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 i Rollup First Sponsor ballot on D4.0 closed February 9, Results were 100/3/ % Affirmative: Passes 74 comments: 33 Technical, 41 Editorial Resolved all comments Second Sponsor ballot on D5.0 closed March 10, Results were 105/3/ % Affirmative 30 comments: 21 Technical, 9 Editorial Recirculation ballot will start soon Asking for conditional approval to go to RevCom Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
8
802.15.4j MBAN Agreed to timeline (15-11-130)
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 j MBAN Agreed to timeline ( ) Reviewed CFA submissions in response to our Call for Applications 3 Applications presented and discussed Issued a Call for Proposals ( ) Agreed to Technical Requirements document ( ) to guide proposers Preliminary Proposals to be heard at May meeting A preliminary proposal response is required for anyone planning to submit a final proposal Responses are required by May 2 Final Proposals to be heard at July meeting Responses are required by July 5 Slide 8 Slide 8 Clint Chaplin, Samsung Electronics Page 8 Page 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
9
802.15.6 Wireless Body Area Networks
September 2008 November 2007 March 2011January 2009September 2008 doc.: IEEE /2752r1 doc.: IEEE /1003r0 March 2011 Wireless Body Area Networks Completed resolving all comments from last ballot Will start recirculation ballot once draft is complete Updated coexistance document On track to begin Sponsor balloting in July 2011 Slide 9 Slide 9 Page 9 Page 9 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems
10
802.15.7 Visible Light Communication
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 Visible Light Communication First recirculation Sponsor ballot on D6.0 closed March 5, Results were 94/3/ % Affirmative 327 comments: 65 technical, 262 editorial, 0 general Finished resolving all comments Now editing comment resolutions into draft. Hoping to start second recirculation Sponsor ballot early April Approved and submitted a modified PAR to match the Scope and Purpose with the Scope and Purpose in draft Asking for conditional approval to publish Slide 10 Slide 10 Clint Chaplin, Samsung Electronics Page 10 Page 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
11
Personal Space Communications SG
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 Personal Space Communications SG The Study group decided it needed to withdraw the PAR from further consideration this week. One of the main motivators for this decision is that the permission to publicly share some of the material referenced in the PAR, and requested in some of the comments, has been withdrawn. The Study Group felt that reworking the PAR in the light of this development and in an attempt to address the other inputs received during the tutorial and comment process could not be effectively done in 24 hours. Slide 11 Slide 11 Clint Chaplin, Samsung Electronics Page 11 Page 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
12
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 TV White Space SG Received several contributions as a result of the call for contributions TV White Space Used for Intelligent Transportation System, Betty Zhou, Huawei (Document ) Usage Model and System Design Considerations for Low-rate WPAN operating TV White Space, Chin-Sean Sum (NICT) (Document ) WPAN Application Operating in TV White Space, Mi-Kyung Oh (Document ) Component of PAR & 5C, Chin-Sean Sum (NICT) (Document ) Draft for SG 4TV PAR and 5C, Mi-Kyung Oh(Document ) Expecting to have a PAR and 5C by July Slide 12 Slide 12 Clint Chaplin, Samsung Electronics Page 12 Page 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
13
Better Use of Spectrum Resources in WPANs IG
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 Better Use of Spectrum Resources in WPANs IG Two technical presentations. System concept of DSA ( r0) Home monitoring application ( r0) Next meeting will held July 2011. Slide 13 Slide 13 Clint Chaplin, Samsung Electronics Page 13 Page 13 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
14
Host Identity Protocol IG
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 Host Identity Protocol IG Did not meet Slide 14 Slide 14 Clint Chaplin, Samsung Electronics Page 14 Page 14 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
15
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 THz IG Contribution #1 Javier Mateos, University of Salamance (Spain), “Room temperature THz sources and detectors with semiconductor nanodevices”, the ROOTHz project; (Document thz) Contribution #2 Sebastian Priebe, TU Braunschweig (Germany), “Diffuse Rough Surface Scattering Analysis for THz Communication Systems; (Document thz) Contribution #3 Sebastian Priebe, TU Braunschweig (Germany), “Spatial and Temporal Dispersion in THz Indoor Propagation Channels”; (Document thz) Discussion on spectrum issues (WRC 2012 preparations) Outcome of WRC 2012 Conference Preparatory Meeting Interference Measurements towards Earth Exploration Services Slide 15 Slide 15 Clint Chaplin, Samsung Electronics Page 15 Page 15 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
16
WNG Did not meet March 2011 September 2008 May 2008
March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 WNG Did not meet Slide 16 Slide 16 Clint Chaplin, Samsung Electronics Page 16 Page 16 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
17
References This document All Documents
September 2008 May 2008 March 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2011 References This document All Documents Current draft is in the members-only area Members_Only_Area members log in using username and password Slide 17 Clint Chaplin, Samsung Electronics Page 17 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.