Download presentation
Presentation is loading. Please wait.
Published byPhan Vân Modified over 5 years ago
1
Flexible Services iNotice Board Saturday April 25, 2015
3/14/13 • Watervliet Avenue • cdta.org 1
2
STAR Daily Performance for Saturday April 25, 2015
Actual Trips: 195 Actual Passengers Transported: 234 Overall On Time Performance 99.49% Scheduled 46.67% Appointment Time: 100% Productivity: 1.42 110 Watervliet Avenue • cdta.org • • 2
3
Advantage Transit Daily Performance for Saturday April 25, 2015
Actual Trips: 307 (61%) Actual Passenger Transported: 315 Overall On Time Performance: 97.58% Scheduled: 97.72% Appointment Time: 95.65% Productivity: 7.79 110 Watervliet Avenue • cdta.org • • 3
4
STAR & Advantage Overall Daily Productivity for Saturday April 25, 2015
Total Trips: 502 Trip Per Hour: 5.32 Actual Passengers Transported: 549 110 Watervliet Avenue • cdta.org • • 4
5
STAR & Advantage Space/Passenger Type Saturday April 25, 2015
STAR Transported: Ambulatory Wheelchair / Scooter, Etc Advantage Transported: Ambulatory 7- Wheelchair / Scooter, Etc Total : Ambulatory Wheelchair / Scooter, Etc Note: Passenger count can be higher than trips performed. This includes all passengers except SVA. 110 Watervliet Avenue • cdta.org • • 5
6
Flexible Services Performance Goals
On Time Performance Goal : 95% Overall On Time Performance (STAR and Taxi) On time is defined as no more than 0 minutes early or 25 minutes late for a scheduled trip Productivity Per Hour Goal : 2.0 Overall Passenger trips per revenue hour (STAR and Taxi) Total revenue hours operated monthly divided by number of completed trips 110 Watervliet Avenue • cdta.org • • 6
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.