1 Western Electricity Coordinating Council
Anchor Data Set (ADS) 10 year Database Building the 2028 ADS PCM Dataset Jamie Austin June 19, 2018 Western Electricity Coordinating Council

2 Western Electricity Coordinating Council
Overview Status Updates on pending fixes Review of the 2028 ADS PCM Dispatch Western Electricity Coordinating Council

3 Western Electricity Coordinating Council
Wheeling Rates Radha Soorya Western Electricity Coordinating Council

4 Western Electricity Coordinating Council
On Peak Off Peak Area/Region_Name Export Hurdle rate in 2017 ADS ($/MW) (2016 dollar) Region Name Schedule 1 Schedule 2 Schedule 7 Schedule 8 Peak Hurdles Off-Peak Hurdles AB_AESO 2.14 AESO BC_BCHA 9.1 BCHA $ $ $ 7.11 BS_IPCO 2.67 IPCO BS_PACE 3.08 PACE $ $ $ $ $ $ CA_BANC 2.53 SMUD $ $ $ $ $ CA_CFE 2.31 CFE CA_CISO 10.98 CISO CA_IID 3.32 IID $ $ $ $ CA_LDWP 5.84 LDWP $ $ $ $ $ CA_TIDC TIDC NW_AVA AVA $ $ NW_BPAT 1.91 BPAT $ $ $ NW_CHPD CHPD NW_DOPD DOPD NW_GCPD GCPD NW_NWMT 4.74 NWMT $ $ $ $ NW_PACW PACW NW_PGE PGE NW_PSEI PSEI $ $ $ $ $ $ NW_SCL SCL NW_TH_Malin TH NW_TPWR TPWR $ $ $ $ NW_WAUW WAUW RM_PSCO 3.09 PSCO $ $ $ $ $ $ RM_WACM 4.98 WACM SW_AZPS 3.95 AZPS $ SW_EPE 4.16 EPE $ $ $ $ $ SW_NVE 6.96 NVE $ $ $ $ $ $ SW_PNM PNM $ $ $ $ SW_SRP 2.02 SRP SW_TEPC 3.57 TEPC $ $ $ $ $ $ SW_TH_Mead SW_TH_PV SW_WALC WALC Western Electricity Coordinating Council

5 Branch Rating Mapping from PF to PCM
Bhavana Katyal Western Electricity Coordinating Council

6 Branch Rating Mapping in GV 10.2.2
PSLF PCM Summer Normal MVA1 Summer – Rate A Summer Emergency MVA2 Summer – Rate B Summer Short Term Emergency - Summer Rate C = Summer Rate B Winter Normal MVA3 Winter – Rate A Winter Emergency MVA4 Winter – Rate B Winter Short Term Emergency Winter Rate C = Winter Rate B PCM Summer months: June 1st – Sep 30th PCM Winter months: Oct 1st – May 31st Western Electricity Coordinating Council

7 Additional Processing Required
Region Area number in PF Winter Rating? (Yes/No) PF Rating Column Identifier (MVA1 - MVA8) Summer Normal PF Rating Column Identifier (MVA1 - MVA8) Summer Emergency Reference PF case for Summer ratings PF Rating Column Identifier (MVA1 - MVA8) Winter Normal PF Rating Column Identifier (MVA1 - MVA8) Winter Emergency Reference PF case for Winter ratings Note Comment NTTG 40 Yes MVA1 MVA2 2028 HS (GE PSLF) MVA3 MVA4 PACW and PGN 23 PACW exceptions use area 65 rule for those 60 some MVA4 zeros, Use MVA3 for MVA4 62 MVA1 -> MVA3 in PSLF MVA2 -> MVA4 in PSLF HW (GE PSLF) 65 23 2029 HS (GE PSLF) WestConnect All 8 ratings? All 8 ratings are provided. WAPA RM, WAPA UM, MT area use PSSE. Need to follow up. AESO Not provided Only 3 ratings provided irrespective of case - Summer Normal, Winter Normal, Winter Emergency BCHydro 50 52 No 2028 HW (GE PSLF) CIPB 30 CIPV TIDC BANC No Post Processing Needed in GV vr Use Summer case for winter rating Use winter case for winter rating Western Electricity Coordinating Council

8 Western Electricity Coordinating Council
Pending Data Fixes Yi Zhang, Jamie Austin, Tyler Butikofer, BK Ketineni, Stan Holland, and Jon Jensen Western Electricity Coordinating Council

9 Western Electricity Coordinating Council
Pending Fixes Load fixes: PACE SPP IPC Other fixes for BTM-PV DG AAEE - Ron found 844 entries in the WECC 2028 HS power flow case, of which 7 were closed (~28 MW); Yi had confirmed all were AAEE. Western Electricity Coordinating Council

10 Hydro Mismatches & Wheeling Rates
Update on reported hydro mismatches by Yi? NW Wheeling rates? Western Electricity Coordinating Council

11 Fix Generators with unknown sub-type
Status of fixes by Ron Fix Generators with Unknown subtype, reported by Yi Western Electricity Coordinating Council

12 Western Electricity Coordinating Council
CO2 Prices – Stan & BK Do we have the right CO2 prices in the model? Do we have the appropriate units outside of CA using the CA CO2 price? Western Electricity Coordinating Council

13 Western Electricity Coordinating Council
AESO Co-Gen - Jon Implement monthly shapes Western Electricity Coordinating Council

14 Western Electricity Coordinating Council
2028 ADS PCM v3.5 Jamie Austin Western Electricity Coordinating Council

15 Western Electricity Coordinating Council

16 Western Electricity Coordinating Council
Dumped Energy Western Electricity Coordinating Council

17 Western Electricity Coordinating Council
Congested Paths Western Electricity Coordinating Council

18 Western Electricity Coordinating Council
Congested Nomograms Western Electricity Coordinating Council

19 Generation Summary by Region
Western Electricity Coordinating Council

20 Western Electricity Coordinating Council
NW – CA Western Electricity Coordinating Council

21 Western Electricity Coordinating Council
Southern CA Imports Western Electricity Coordinating Council

22 Western Electricity Coordinating Council
IPP-DC Western Electricity Coordinating Council

23 Western Electricity Coordinating Council
Canada to NW Western Electricity Coordinating Council

24 Western Electricity Coordinating Council
TOT 2 Western Electricity Coordinating Council

25 Western Electricity Coordinating Council
WY – UT: Path C, & Aeolus Western Electricity Coordinating Council

26 Western Electricity Coordinating Council
Bridger West Western Electricity Coordinating Council

27 Western Electricity Coordinating Council
Idaho - NW Western Electricity Coordinating Council

28 Western Electricity Coordinating Council
MO-NW Western Electricity Coordinating Council

29 Northern – Southern California
Western Electricity Coordinating Council


Download ppt "Western Electricity Coordinating Council"

Similar presentations


Ads by Google