Presentation is loading. Please wait.

Presentation is loading. Please wait.

Running the Experiment

Similar presentations


Presentation on theme: "Running the Experiment"— Presentation transcript:

1

2 Running the Experiment
Step 1. Open the movie file Step 2. Observe the operation of case 1 and record your observations. Step 3. Observe the operation of case 2 and record your observations. Step 4. Identify the pros and cons of the two different maximum green time settings on the westbound approach and on the overall performance of the intersection.

3 Critical Thinking Questions
Are all of the vehicles in the initial queue on the EB approach served before the end of each green interval? What is the mechanism for termination of the phase serving the westbound approach? What are the advantages and disadvantages of the 40 second maximum green time for the operation of case 1? What are the advantages and disadvantages of the 60 second maximum green time for the operation of case 2? Which maximum green time setting would you select and why?

4 Data Collected Green Interval Durations for case 1 and 2

5 Variation of Green Time with Maximum Green

6 Variation of Delay with Maximum Green

7 Question 1 Are all of the vehicles in the initial queue on the EB approach served before the end of each green interval?

8 Question 1

9 Question 2 What is the mechanism for termination of the phase serving the westbound approach?

10 Question 3 What are the advantages and disadvantages of the 40 second maximum green time for the operation of case 1?

11 Question 4 What are the advantages and disadvantages of the 60 second maximum green time for the operation of case 2?

12 Question 5 Which maximum green time setting would you select and why?


Download ppt "Running the Experiment"

Similar presentations