Download presentation
Presentation is loading. Please wait.
Published byPhyllis Roberts Modified over 6 years ago
1
PORCH REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). MAJOR MAINTENANCE FY 16 73AB LAWN AVENUE PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-10-1
2
PORCH REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS
73AB LAWN AVENUE PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-10-2
3
PORCH REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS
73AB LAWN AVENUE PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-10-3
4
PORCH REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS
THESE PHOTOS ARE FOR REFERENCE ONLY. WEST SIDE PORCH ROOF WAS REPLACED OVER THE SUMMER OF EAST SIDE PORCH ROOF TO BE REPLACED AS PART OF THIS PROJECT. SCOPE IS SIMILAR – SEE NOTES ON DRAWINGS. 73AB LAWN AVENUE PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-10-4
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.