1 2010 Strategic Plan Update – WG Feedback
April 2014 Michael Desselle Vice President, Process Integrity

2 Our Vision of the Future

3 Three Foundational Strategies
The SPP strategy rests on three foundational elements: Building a robust transmission network Developing efficient market processes Creating member value Create capabilities and processes needed to fulfill SPP’s mission & maintain/improve Value Proposition in rapidly changing environment Initiatives in each broad strategy become the tactical implementation of the strategies Build Robust Transmission System Strategically looking at trans as an “enabling asset” Paradigm shift away from traditional mode of T plan on parochial basis (i.e., T built to utilize local Gen to serve local load) to T plan on regional construct (i.e., T built to utilize Gen anywhere in the footprint for the benefit of all end users in the footprint) Enables & supports strategy for development of future mkts Develop Efficient Market Processes Known for some time that liquid & efficient DA & RTB mkts enable customers/members to take advantage of region’s diverse Gen resources. Continuation of the effort to develop systems & tools to create efficient, effective & transparent mkt processes Create Member value Create/continually improve work processes to insure efficiency & effectiveness Recognize that costs of our strategic initiatives impact members & further that Org costs need to be controlled/contained Recognize importance of strategic initiative prioritization Want to provide visibility/insight into staff efforts to achieve initiatives & fulfill one of our internal culture drivers (continuous improvement). Lastly, we develop processes to demonstrate to members/regulators/ customers the general inter-zonal equity of costs/benefits for all these strategic initiatives

4 Three Foundational Strategies
Initiatives IT Planning Process (check and adjust) Integrated Resource Planning Ag Study upgrade exposure reporting Forecasting (regional) Robust Seams (planning, cost estimates, usage, compensation, agreements, interregional optimization) Order 1000 rigor IS Integration ESWG/TWG/BPWG/RTWG/FC/CAWG/RSC - specifically study cycles, strategic scenarios, and integrated resource planning BPWG – Studies/Models/assumptions consistency; Z2 Creditable Upgrades SSC – Robust trans on the seams; cost causation compensation on seam: DC Ties; IS Integration PCWG – Cost estimate SCERTS: Study Estimate Design Guide in DPP/RFP process; Min Design Stds (ALSO ESWG); Build assurances; Seams Cost estimation processes RTWG/FC – Build Assurances (quantify benefits of T and compare projected to actual) ; More granularity in Benefit calculation RSC/CAWG – Cost effective transmission; continued PCWG rigor on costs; OCC - maintain transparency in addressing load changes

5 Three Foundational Strategies
Initiatives Impact Assessments/Project Prioritization/PMO best practices Enhanced Combined Cycle Renewable Energy Credit Market Demand Response integration (check and adjust) Enhanced Outage Coordination Align Transmission Service process with Market Gas/Electric Coordination Improve Wind Integration IS Integration CWG- early engagement prior to approval and submission to MOPC; Vendor engagement improvements MWG/CAWG/RSC – REC Mkt, Outage coordination; Pre-ramp Ops Plan: new ramp products: DC tie integration: DR Market: T Service; GEH; Resource adequacy BPWG – Gas Coordination ORWG – Wind Integration improvement RTWG – Planning to utilize Mkt Data; Reevaluate the integration of DR resources. FC – Net metering on load and transmission SSC – IS Integration PUCT – improve renawable integration

6 Three Foundational Strategies
Initiatives Reliability Excellence SPP Grid-level preparedness/CIP support Benchmarking and measurement Ratepayer value Strategic membership expansion CIPWG – SPP GridEX BPWG – Strategic Expansion must make economic sense; CIP Support RCWG – Advise/consult/perform assurance for IM/CBA; Compliance registration/standards process coord; RE/RCWG relationship enhancement; Reliability Excellence is foundation for first 2 foundational strategies FC – Document real benefits for Transmission and IM and Broadcast value; Impact to Corporate governance/committee/working group dynamics CAWG/RSC – Ratepayer value considered in future decision-making