1 April 18, 2017 Third Party Meters Advanced

2 Agenda Honeywell A3 (MeterCat) Aclara i210 MeterCat Overview and Setup
ESM Non ESM A3K A3R Aclara i210

3 Honeywell A3 A3T A3R A3Q A3K Properties Constants Quantities Demand
Interval Data Configuration Display Remote Day Types Switch Times Special Dates Special Features Logs Configuration Service Test

4 Honeywell A3 ESM Configuration A3T A3R A3Q A3K
Must be configured for Time of Use Interval Data Configuration choose the desired object in the Quantities to Record list. The same ESM LP channel interval data object must also be configured as a metered object in Metercat's Quantities Tab as one of the Metered Quantities. Special Dates Configuration Special Dates Tab (Self Read) Click the Add button; Metercat will display the Recurring Date Configuration screen Uncheck the Calendar Action checkbox Check the Self Read checkbox Select the Every radio button and set to "1 day" starting the day you program the meter

5 Honeywell A3 DST Configuration A3T A3R A3Q A3K
Must be configured for Time of Use Special Dates Configuration Special Dates Tab (Self Read) Click the Add button; Metercat will display the Recurring Date Configuration screen Check the Calendar Action checkbox Select the Start Daylight Saving Time radio button Select the End Daylight Saving Time radio button

6 Honeywell A3 A3 Alpha Meter Order Entry Confirmation Checklist
The meter type has been programmed for TOU The meter style number has been properly configured and will be ordered with Load Profile (LP) enabled The meter LP interval length is configured to 5, 15, 30, or 60 minutes only The meter has been configured for Daily Self Read The ESM LP sources and the Meter Quantities are both configured and that they match The MeterCat Program File (PED) has been reviewed by Sensus

7 Aclara i210 MeterMate v5.53 is required Rate Type Calendar
Time of Use/Load Profile [LP] Calendar Daily Self Reads must be enabled, one entry for each day of the week Basic Meter Configuration Demand Metering Uncheck the Automatic Self Read on Demand Rest box Site Voltage and Current Transformer Ratio prompts should be disabled

8 Aclara i210 Display Table Options Utility Configuration Options
No FlexNet ESM configuration requirement Utility Configuration Options RCDC options Meter Diagnostics Options Event Log Voltage Event Monitoring should be Enabled Recorder Option Load Profile Interval Length 5, 15, 30, and 60 minutes only. Load Profile Outage Recovery and Outage Recording must be enabled

9 Aclara i210 Meter Order Entry Confirmation Checklist
Meter has the A2, E2, N2, R2, T2, V2 and Q2 softwitches Confirm that the meter program was built with MeterMate v5.53 Rate type has been programmed for Time of Use (TOU)/Load Profile (LP) LP Interval Length is configured to 5, 15, 30, or 60 minutes only Daily Self Reads have been configured Auto Self Read on Demand Reset is Disabled Voltage and Current Transformer Radio – Prompt is Disabled Event Log – Monitor Voltage Events is Enabled Confirm that the Load Profile Outage Recovery is Enabled

10 Questions?