Beam Interlock Systems
LHC2 LHC1 INJ2 INJ1 TI8 EXT1 TI2 CNGS 2006: SPS, EXT1, EXT2, CNGS operational 2007: TI2, TI8 operational 2008: INJ1, INJ2, LHC1, LHC2 operational SPS EXT2 Safe Machine Parameters System
3
Beam Interlock System At the end of last year:
99.996% availability 2006-date Internally and externally reviewed will be ready for 2010 with minor changes for 2010: Java Application has known limitation and bugs, not critical for operation. Pre-Operational Checks and Internal Post-Operational Checks improvement Automated Interface Tests to be implemented by User Systems Additional inputs to be commissioned Documented and ranked in JIRA, being implemented → Alick Macpherson In progress, need more real events to use as templates → TE/MPE/MI PIC, WIC, FMCM, BLM, BTV all ready, others coming → TE/MPE/MI and MPP Redundant Beam Position Monitor in IR6 → installed if cables ready “Injection Kicker in Timing Test Mode” key switch → in preparation Safe Machine Parameters System
4
Safe Machine Parameters System
SPS SMP LHC SMP Safe Machine Parameters System
5
Safe Machine Parameters System
SPS SMP LHC SMP Safe Machine Parameters System
6
Safe Machine Parameters System
At the end of last year: 2008: SPS SMP operational no missed extractions no loss of availability due to this system 2009: LHC SMP operational first implementation → some availability issues Several changes → no availability issues Safe Machine Parameters System
7
Compare BETS Energy + Status with BLM Energy
Energy Path Compare BETS Energy + Status with BLM Energy Safe Machine Parameters System
8
Energy Path Courtesy of G. Kourkafas, M. Koratzinos
Installation & commissioning of modified hardware Before modification 2-3 times per week Not observed since 20th November Safe Machine Parameters System
9
Safe Machine Parameters System
At the end of last year: 2008: SPS SMP operational no missed extractions no loss of availability due to this system 2009: LHC SMP operational first implementation → some availability issues Several changes → no availability issues Known limitations with 2009 version: No consistency check between energy values received (from BETS) No truly-redundant path for producing flags Timing distribution is not cross-checked User Permit connection from SMP to BIS is not implemented Difficult to find balance between safety and availability & feedback from BIS external review revealed areas for improvement: System specifications are incomplete Stakeholder expectations are not consistent Difficult to appraise safety without a solid base Current approach is not satisfactory Safe Machine Parameters System
10
Two Phases 1. Reinforce the 2009 system for 2010 during the next four weeks Software Interlock System – check energy over timing Setup-Beam Flag – automatically forced false during normal physics fills Masks on the BIS – automatically removed during normal physics fills Jorg coordinating, ready for restart afe 2. Overhaul LHC SMP in 2010, by 2011 ready for LHC nominal energy & intensity Specification – re-write and ratification SMP Controller – redesign (20% to 80%) to new specification Safety Review – to check adherence Note: SMP is only as strong as its dependencies: Intensity Information – Beam Current Transformer Dependability (safety, reliability, availability) must be clarified Transmission medium – General Machine Timing Various methods and solutions for cross-checking must be investigated Safe Machine Parameters System