Presentation is loading. Please wait.

Presentation is loading. Please wait.

MISG January 2007 Industry contact: - Alan Naismith SRK Consulting

Similar presentations


Presentation on theme: "MISG January 2007 Industry contact: - Alan Naismith SRK Consulting"— Presentation transcript:

1 MISG January 2007 Rock mass damage associated with pre-split blasting in surface mining

2 MISG January 2007 Industry contact: - Alan Naismith SRK Consulting
mobile: land line

3 MISG January 2007 What is pre-split blasting?
Why is it important in surface mining?

4

5 MISG January 2007 Example of damage caused by blasting

6 MISG January 2007 How does a pre-split work?

7

8

9

10 MISG January 2007

11 MISG January 2007

12 MISG January 2007 But everything doesn’t always go to plan!

13 MISG January 2007

14 MISG January 2007

15 MISG January 2007 RESEARCH QUESTIONS:-
What dynamic forces are created near to the mouth of the hole that could lead to “anomolous” fracture patterns? What must be done to modify these forces and minimise or eliminate these “anomolous” fracture patterns?

16 MISG January 2007 Industry contact: - Alan Naismith SRK Consulting
mobile: land line


Download ppt "MISG January 2007 Industry contact: - Alan Naismith SRK Consulting"

Similar presentations


Ads by Google