Download presentation
Presentation is loading. Please wait.
1
Example of Throughput (UDQO) by “Category”
Factors to apply to Supply Point category; SP Category A = 0 SP Category B = 0.5 SP Category C = 1 SP Category D = 1 C D A B Supply Point Categories
2
Throughput (UDQO) after Application of Factors & Unidentified Gas
Factors to apply to Supply Point category; UG UG SP Category A = 0 SP Category B = 0.5 SP Category C = 1 SP Category D = 1 A B C D Supply Point Categories Unidentified Gas applied in proportion to throughput (UDQO) after factors have been applied
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.