Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE MEDIA INDEPENDENT HANDOVER

Similar presentations


Presentation on theme: "IEEE MEDIA INDEPENDENT HANDOVER"— Presentation transcript:

1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER
DCN: hwnm Title: HWN Mgmt. SG Closing Report Date Submitted: May 13, 2010 Presented at IEEE session #38 in Bangalore, India Authors or Source(s):  Johannes Lessmann (NEC) Abstract: closing report of the Heterogeneous Wireless Network Management SG

2 IEEE 802.21 presentation release statements
This document has been prepared to assist the IEEE Working Group. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE The contributor is familiar with IEEE patent policy, as stated in Section 6 of the IEEE-SA Standards Board bylaws < and in Understanding Patent Issues During IEEE Standards Development

3 Closing Report 4 Presentations to the SG in this meeting
Yoshihiro Ohba, Toshiba Management issues/use cases in Smart Grid Networks I-Kang Fu, MediaTek Multi-Radio Integration for Heterogeneous Networks Walter Buga, Proximetry Brief Introduction of EU-MESH Antonio de la Oliva, UC3M Relationship of and 1 Presentation postponed (Nageen Himayat, Intel) Presentation of SG overview to NetMan Strawpoll on whether SG participants believe is a good framework for requirements (see ) 9/0/0 (yes/no/abstain) Plan for future progress: continue offline discussions with interested companies collect additional use cases, technical input depending on input, start drafting PAR decision on how to proceed with SG must be made in Nov. latest


Download ppt "IEEE MEDIA INDEPENDENT HANDOVER"

Similar presentations


Ads by Google