Presentation is loading. Please wait.

Presentation is loading. Please wait.

Common Implementation Strategy for the

Similar presentations


Presentation on theme: "Common Implementation Strategy for the"— Presentation transcript:

1 Common Implementation Strategy for the
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status, 8th Meeting JRC, Ispra, Italy, March 2006

2 Next steps and reporting of the intercalibration process AS Heiskanen (JRC)

3 Final intercalibration reporting
M5 Tasks remaining for the last months May-November Timelines for the next MI6 reporting First draft report Consultation rounds of ECOSTAT & GIGs Delivery of final IC report to SCG and WFD Committee Other deliverables for SCG and WFD Committee

4 Task Who does Who receives Dead-line MI5 summary IC steering group
ECOSTAT 7 April Template for MI6 reporting (draft outline of the final report) GIG-coordinators (GIGs) 5 May MI6 report 26 May Final report, 1 DRAFT ECOSTAT & GIGs 9 June ECOSTAT meeting 14-15 June

5 Task Who does Who receives Dead-line ECOSTAT meeting 14-15 June Written comments ECOSTAT & GIGs IC steering group 8 September Final report, 2 DRAFT 20 September ECOSTAT Meeting 12-13 October Final written clarifications ECOSTAT 16 October FINAL REPORT SCG/ WFD Committee 17 October SCG/ WFD Committee meeting 8-9 November

6 Other Tasks for 2006 WP ECOSTAT for CIS 2007-9;
Planning of the future on IC exercise; Updated Boundary setting protocol; Harmonisation proposal First ideas to SCG 15 May First draft to ECOSTAT June 14-15 Delivered to SCG 5 October

7 x GIG milestone Plan for continuation WP ECOSTAT CIS 2007-9
3 4 5 6 7 8 9 10 11 12 GIG milestone MI6 Plan for continuation D1 D2 WP ECOSTAT CIS Updated BSP Intercalibration Report D3 WG2A meeting x SCG/ Com meeting Water Directors D = draft; MI6= milestone 6


Download ppt "Common Implementation Strategy for the"

Similar presentations


Ads by Google