Download presentation
Presentation is loading. Please wait.
Published byBarry Price Modified over 5 years ago
1
IEEE 802.11/15 Regulatory SC Bangkok Meeting Plan and Agenda
April 2009 doc.: IEEE /xxxxr0 September 2015 IEEE /15 Regulatory SC Bangkok Meeting Plan and Agenda Date: Authors: Rich Kennedy, MediaTek Rich Kennedy, Research In Motion
2
April 2009 doc.: IEEE /xxxxr0 September 2015 Abstract This presentation is the plan for the IEEE /15 Regulatory Standing Committee meeting at the Bangkok IEEE 802 Wireless Interim the week of September 14, 2015. Rich Kennedy, MediaTek Rich Kennedy, Research In Motion
3
Agenda [TAM2, ThAM1] September 2015
Administrative items and approve the minutes from Waikoloa Introduction The regulatory summaries FCC re LTE-U FCC administrative changes Actions required Preparation for September ETSI ERM TG11 meeting Preparation for October ETSI TC BRAN meeting TBD AOB and Adjourn Rich Kennedy, MediaTek
4
Administrative Items Required notices IEEE Code of Ethics
September 2015 Administrative Items Required notices IEEE Code of Ethics IEEE Standards Association (IEEE-SA) Affiliation FAQ Antitrust and Competition Policy Letter of Assurance Form IEEE-SA Patent Committee FAQ & Patent slides and Chair and Secretary request Chair is Rich Kennedy (MediaTek) Rich Kennedy, MediaTek
5
SC Operating Rules Anybody can vote, present, and make motions
May 2012 doc.: IEEE /0675r0 September 2015 SC Operating Rules Anybody can vote, present, and make motions Participation in SC during and WG Plenary or Interim counts towards voting rights in the respective working group All motions must pass by a 75% majority Rich Kennedy, MediaTek Clint Chaplin, Chair (Samsung)
6
Other Guidelines for IEEE WG Meetings
May 2015 doc.: IEEE /0512r0 September 2015 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. Rich Kennedy, MediaTek 6 Dorothy Stanley(Aruba)
7
Introduction Purpose Scope Critical Issue Focus September 2015
Improve the working relationship between the technical experts and the regulatory specialists, especially when it comes to critical technical issues Scope The group will review new regulatory changes or impending changes affecting and standards Each meeting will focus on the most critical issue at the time Critical Issue Focus Direct impact on IEEE and current and future standards Response/Input deadlines Coordination with IEEE (RR-TAG) Coordination with the Wi-Fi Alliance Rich Kennedy, MediaTek
8
Approve the Waikoloa Minutes
September 2015 Approve the Waikoloa Minutes Motion: To approve the minutes from the IEEE /15 Regulatory SC meeting at the Waikoloa Plenary in document 11-15/0731r0 Posted 16-Jul :51:54 ET Moved by: Seconded by: Discussion? Vote: Unanimous consent Rich Kennedy, MediaTek
9
Tuesday AM2 Review and approve the agenda Administrative items
September 2015 Tuesday AM2 Review and approve the agenda Administrative items Introduction The regulatory summaries FCC administrative changes FCC FCC LTE-U concerns Actions required Preparation for September ETSI ERM TG11 meeting Preparation for October ETSI TC BRAN meeting TBD Recess until Thursday Rich Kennedy, MediaTek
10
Regulatory Updates September 2015 ET Docket 15-105 re LTE-U
FCC administrative changes FCC and EU active regulatory work Rich Kennedy, MediaTek
11
FCC 15-105 First Public Notice asks for information about fairness
September 2015 FCC First Public Notice asks for information about fairness OET Chief special provisions on LTE-U device certifications “Applications for certification of LTE-U equipment have been placed on our Pre-approval Guidance list, which means that Telecommunications Certification Bodies must consult with the FCC Lab before certifying such equipment.” Wi-Fi Alliance expressed support Qualcomm/Verizon et al oppose Rich Kennedy, MediaTek
12
September 2015 FCC 15-92 Amendment of Parts 0, 1, 2, 15 and 18 of the Commission’s Rules regarding Authorization of Radiofrequency Equipment; and Request for the Allowance of Optional Electronic Labeling for Wireless Devices ET Docket Thursday AM1 presentation to discuss implications of the administrative changes Rich Kennedy, MediaTek
13
Active FCC Proceedings
September 2015 Active FCC Proceedings GN Docket Innovation Opportunities of Spectrum Through Incentive Auctions FCC NPRM FCC R&O FCC NPRM (Vacant Channel) FCC (Commencement of Operations) GN Docket Commercial Operations in the MHz Band FCC NPRM and Order FCC FNPRM FCC R&O and Second FNPRM ET Docket GHz bands FCC NPRM FCC NPRM IB Docket Globalstar FCC NPRM ET Docket Rules for Unlicensed Use of TV & 600 MHz Bands DA Order GN Docket Use of Spectrum Bands Above 24 GHz For Mobile Radio Services FCC NOI ET Docket Authorization of Radiofrequency Equipment & Request for the Allowance of Optional Electronic Labeling for Wireless Devices FCC NPRM ET Docket Current Trends in LTE-U and LAA Technology DA Public Notice (with questions) Rich Kennedy, MediaTek
14
EU Regulatory Activities
September 2015 EU Regulatory Activities TVWS 2400 5250- 5350 5350- 5470 5470- 5725 5850- 5925 60 GHz Next action European Commission B CEPT CPG CPG15 Sep 14-18 EC Common Prop ERM TG11 EN Sep 28-Oct 1 ETSI BRAN Oct 13-16 ECC/SE24 (Short Range Devices) YELL WI52 Sep CET Oct 19-21 Dec 7-9 ECC/WGFM (Frequency Management Working Group) Oct 1-2 ECC/FM55 (5 GHz WAS/RLAN) ECC/FM/SRDMG (Short Range Devices Maintenance Group) Dec 9-11 [ ] = Inactive, B = Begun, GO = Go, YELL = Not going well, pay attention, RED = Help! Rich Kennedy, MediaTek
15
ETSI ERM TG11#44 Preparation ETSI TC BRAN#84 Preparation TBD
September 2015 Actions Required ETSI ERM TG11#44 Preparation ETSI TC BRAN#84 Preparation TBD Rich Kennedy, MediaTek
16
ETSI ERM TG11#44 September 28-October 1, 2015
Finalizing RED compliance [publication by 3/15/16] Receiver requirements – still no clear regulator definition of required tests Spectrum Load Factor proposal WIA revised effort to add non-LBT technology Showing signs of abandoning 7-year battle to add non-LBT technology to the 2.4 GHz band Thursday AM1 we will di.scuss documents posted for this meeting Rich Kennedy, MediaTek
17
September 2015 ETSI TC BRAN#84 October 13-16, 2015 Finalizing RED compliance [publication by 3/15/16] Waiting for regulatory feedback in August EN (5 GHz) Coexistence with LAA-LTE must be resolved Receiver requirements proposal from WFA EN (60 GHz) Sharing requirements discussion Receiver requirements EN (TVWS) Receiver requirements Thursday AM1 we will di.scuss documents posted for this meeting Rich Kennedy, MediaTek
18
Thursday AM1 Review and approve the agenda
September 2015 Thursday AM1 Review and approve the agenda Complete the work begun on Tuesday Review documents posted for ETSI ERM TG11#44 and TC BRAN#84 Implications of FCC 15-92 AOB Adjourn Rich Kennedy, MediaTek
19
Teleconferences Bi-weekly on Thursdays, 12:30 to 13:30 ET
September 2015 Teleconferences Bi-weekly on Thursdays, 12:30 to 13:30 ET Rich Kennedy, MediaTek
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.