Download presentation
Presentation is loading. Please wait.
Published byCharity Bates Modified over 5 years ago
1
Technology Maturation & Manufacturing Development Phase
Materiel Development Decision Initial Capabilities Document Materiel Solution Analysis Phase Requirements Authority Review of AoA Results Draft Capability Development Document* A Technology Maturation & Risk Reduction Phase Capability Development Document* B Engineering & Manufacturing Development Phase Capability Development Document* Legend = Decision Point = Milestone Decision = Requirements Document = Requirements Authority Review * Or equivalent Approved/Validated Requirements Document. Development RFP Release Decision Point C Production & Deployment Phase Operations & Support Phase Disposal
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.