NEW MEDICAL FACILITY BUILDING
By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1
2
Introduction Our senior project this semester will involve complete development of a theoretical medical building. We will determine preliminary design, building and fire code requirements, the site location, and begin the preliminary building estimates. Rooms Waiting Room Play Room Restroom Utility Room Break Room Reception Room X-Ray Room Processing Room Ambulatory Room Doctor Office Administration Office Nurse Office 3 Exam Rooms The building will be 2,378 square feet.
3
Preliminary Drawings Floor Plan
4
Preliminary Drawings North and South Elevations
5
Preliminary Drawings East and West Elevations
6
Building Codes The building codes come from the Hammond Zoning Ordinance booklet. Part 1: Principles and Objectives Section Commercial 1.306 Part 3: Schedule of District Regulations Adopted Section 3.8 – C-1 Commercial District 3.805 3.806 3.807 Part 5: Off-Street Parking and Loading Requirements Section 5.3 – Commercial 5.301 Section 5.6 – Off-Street Loading Requirements 5.601
7
Fire Codes The fire codes came from the NFPA 101 Life Safety Code booklet. Chapter 26: New Building Occupancies Section 26-1: General Requirements 26-1.7 Section 26-2: Means of Egress Requirements 26-2.4 26-2.6 26-2.8 Section 26-3: Protection 26-3.5
8
Determining Location Hammond, LA Main road Zoning: Commercial
Easy access Narrowed down to 3 locations
9
Location 1 1107 West University Ave. 1.15 acres Price: $799,695
Lot is cleared and ready to build on
10
Location 2 On the corner of East University Ave. and North Cherry St.
5.5 acres Price: $250,000 Not cleared
11
Location 3 Highway 190, West of I-55 3.07 acres Price: $129,000
Not cleared
12
Final Location We chose location 2
Decision was based on location, price, and lot size Only 3 acres will be used Sell the remaining 2.5 acres for roughly $100,000 A total of around $150,000 invested after selling land
13
Timeline/Deliverables
Week 1-2 1/20/15 – 2/3/15 Determine a project and the tasks involved Week 3-4 2/4/15 – 2/18/15 Determine a site location and cost of the property Week 5 2/19/15 – 2/26/15 Specify the building codes Week 6 2/27/15 – 3/6/15 Specify the fire codes Week 7 3/7/15 – 3/14/15 Work on preliminary drawings; floor plan and elevation plans Week 8 3/15/15 – 3/22/15 Work on proposal document and presentation Week 9-13 3/23/15 – 4/27/15 Begin estimation for materials Week 14-15 4/28/15 – 5/8/15 Prepare final document and presentation
14
Any Questions?