Download presentation
Presentation is loading. Please wait.
1
IEEE 802.11aj Process Overview
April 2007 doc.: IEEE /0570r0 Sept 2012 IEEE aj Process Overview Date: Authors: Xiaoming Peng / I2R Eldad Perahia, Intel Corporation
2
Task Group Steps Begin Task Group Create Selection Procedure
Sept 2012 Task Group Steps Begin Task Group Elect Officers Create Selection Procedure Develop TG documents Begin Selection Procedure Confirmation vote Initial Letter Ballot Comment Resolution Recirculation Ballot(s) Initial Sponsor Ballot Recirculation Sponsor Ballot(s) Xiaoming Peng / I2R
3
TG documents Sept 2012 Functional Requirements Evaluation Methodology
PAR Additional quantitative constraints Evaluation Methodology Discuss usage models and then define limited set simulation scenarios for MAC simulations Define PHY simulations Channel Models 60GHz Reuse 60GHz channel model used for 11ad 45GHz Impulse responses Path loss Antenna Define model per simulation scenario environment Xiaoming Peng / I2R
4
Official Time Line for 802.11aj
Sept 2012 Official Time Line for aj : PAR approved : WG Letter Ballot Initial : WG Letter Ballot Recirculation : Form Sponsor Ballot Pool : MEC Done : Sponsor Ballot Initial : Sponsor Ballot Recirculation : Final WG approval : Final EC approval : RevCom & Standards Board approval Xiaoming Peng / I2R
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.