Article 13 RBMP reporting testing 2009
WG D Meeting 31 March 2009 Mette Wolstrup
2
History First phase of schema testing in February
Volunteer MS (comments from AT, DE, FR, HU, SE, UK) Appr. 60 comments received Update to schemas made for the second phase WRc to Atkins handover
3
Schemas
4
Schemas Seven streamlined or new Article 3, 5 and 13 schemas
Updated schemas will include Economics (Reporting sheets ECO1 and ECO2) Three article 8 schemas (only documentation updated, no schema changes) Varying levels of complexity and information requirements
5
Schemas Administrative arrangements (Schema RBDSUCA)
Surface Water Bodies (Schema SWB) Groundwater Bodies (Schema GWB) Register of Protected areas (Schema ProtArea) Surface Water and Groundwater Methodologies which is divided into: (Schema SWBMethods for Surface Water Bodies) and (Schema GWBMethods for Groundwater Bodies) River Basin Management Plans and Programmes of Measures (Schema RBMP_POM) There is a WFDCommon schema which provides common elements to the other schemas which is not tested on its own.
6
Cross-schema linkages
7
Testing process
8
Phase two testing objectives
Schemas Submission workflow Database to XML conversion tool XML validation tool Documentation
9
Submission workflow EEA/ Commission
10
Phase 2 testing Led by Atkins Scheduled to start in beginning of June
Schemas available for download Help desk contact Supporting documentation and tools online
11
Testing support Help desk (helpdeskWFD@atkinsglobal.com)
Template for reporting issues Specific dialogue where appropriate
12
Capturing any issues Log What was tested and by whom
What the problems were Actions required: i) schema change ii) documentation change iii) other action Reviewing the schema test data
13
Access database
14
Mapping the data to a database
Databases managed at RBD level Database structure which supports the schemas Organising information for submission XML conversion tool links to database to create XML schemas
15
Access Database Design
16
Table dependencies
17
Table design
18
XML conversion tool
19
Support for generating the XML
Tool which links to Access databases and generates XML files for the appropriate schemas Validation carried out in desktop tool
20
Conversion tool
21
Desktop XML validation tool
22
Desktop validation tool
23
Validation tool Installation downloaded from ReportNet
Validates the XML files Retrieves schema from ReportNet Accesses QA/QC validation on ReportNet Same checks and output as ReportNet
24
ReportNet
25
ReportNet Workflow Upload Validation performed (dependent schemas)
Resubmit to correct errors (full submission only) Close envelope on completion
26
Workflow testing CDR test area ReportNet envelope management
Guidance document ReportNet QA/QC validation (cross schema checking) Closing of envelopes Letter generation
27
Envelope management RBD level reporting Envelopes will be pre-created
One envelope for national level schema
28
Validation rules Technical level validation ensures that numbers are entered as numbers, no characters; that the XML file is well-formed and so on. Business rule validation handles the more complex relations in the report, e.g. where data is mandatory if and only if other fields have a certain value. The validation rules are meant to ensure data meet the requirements of the reporting sheets. The rules also check that the reported data have the correct format to be stored in the WFD database model.
29
Documentation
30
Support documentation
User guidance: Schema description Access tool help XML Conversion tool Desktop Validation tool QA/QC validation tool help ReportNet workflow GIS submission guidance
31
Online resources
32
Obligation and information
33
Support files
34
Timeline
35
Testing timeline Start-June: Tools available for 2. testing phase
Schemas Schema support documentation Database Desktop XML validation tool Database to XML conversion tool Workflow documentation GIS specific guidance June to September: 2. testing period October: Final version of schemas (incl. all relevant reporting tools) available for download on EIONET
36
Notification Questions?
if wish to participate in 2. testing phase and receive notifications when tools and documents are ready Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.