Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGs LA Closing Report Date: Author: January 2011

Similar presentations


Presentation on theme: "TGs LA Closing Report Date: Author: January 2011"— Presentation transcript:

1 TGs LA Closing Report Date: 2011-01-20 Author: January 2011
November 2009 doc.: IEEE /1091r0 January 2011 TGs LA Closing Report Date: Author: Name Address Affiliation Phone Dee Denteneer HTC 37; 5656 AE Eindhoven; The Netherlands Philips Dee Denteneer (Philips) Guido R. Hiertz (Philips)

2 TGs closing report for the January 2011 meeting.
November 2009 doc.: IEEE /1091r0 January 2011 Abstract TGs closing report for the January 2011 meeting. Extensively discussed most likely timeline, which would lead to a request for Unconditional Approval in July and a publication date around September Worked on resolutions to the comments received during the first Sponsor Ballot. Expect a first recirculation after the TG s ad hoc in Munich Dee Denteneer (Philips) Guido R. Hiertz (Philips)

3 January 2011 Status Before meeting TGs passed its first Sponsor Ballot based Draft 8.0 with 95.6% approval rate (closed: January ). We received 367 technical comments During meeting Reviewed the timeline, joint with a REVmb and in the editors’ meeting. Resolved comments Dee Denteneer (Philips)

4 January 2011 Timeline review During meeting, we reviewed the timeline, joint with a REVmb and in the editors’ meeting; see 11-11/107r1. Currently envisaged scenario date Recirculations February-June, 2011 Request EC Unconditional Approval to go to Revcom July 2011 Get on September Revcom agenda Before 29 July 2011 Revcom approval September 2011 Publication Dee Denteneer (Philips)

5 January 2011 Comment resolution During meeting, we resolved 290 comments, or approximately 80% of the comments received in the recirculation; see 11-11/0027r5. Straw polls gave clear directions on the resolutions of remaining comments. editorial technical received open Part of no vote 7 113 27 Not part of no vote 177 33 70 12 Dee Denteneer (Philips)

6 Plan First recirculation targeted mid february after the Eindhoven ad hoc, February 7-9, hosted by Philips Prepare tutorial for March plenary


Download ppt "TGs LA Closing Report Date: Author: January 2011"

Similar presentations


Ads by Google