1 Subchapter M 6 Month Review
CDR Jason Boyle USCG Sector New Orleans

2 Milestones Sector New Orleans issued first TSMS COI on June 15th 2018
Sector New Orleans issued first CG Option COI on July 20th 2018 Streamlined the review process from over 3 weeks to less than a week for a complete package Added a third member to the Inspected Towing Vessel Branch team – CWO Kevin Parrington

3 COI Statistics COI’s issued Nationally – 345
COI’s issued in District COI’s issued by Sector New Orleans – 35 2nd most in D8 (MSU Houma) More COI’s issued than any other District besides the 8th. 10% of COI’s Nationally 15% of COI’s in District 8. 2/28/2019 Unclassified

4 Deficiencies and Detentions
2/28/2019 Unclassified

5 Deficiencies and Detentions
Unclassified

6 Deficiencies and Detentions
I would like to talk about deficiencies and detentions. Deficiencies are typically something that needs to be fixed but is not immediate enough that it must be fixed immediately. We would generally give a week or two weeks to fix the issue. TPO’s may give a similar time frame Detentions – a hazardous condition that affects the vessel’s ability to operate and must be corrected immediately. Generally fall into 3 categories – Fire Fighting, Life Saving, or Water Tight Integrity. I am going to show some pictures and would like audience participation to tell me if it is a deficiency or a detainable item Unclassified

7 Questions 2/28/2019 Unclassified