Presentation is loading. Please wait.

Presentation is loading. Please wait.

Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR 01.01.2015.

Similar presentations


Presentation on theme: "Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR 01.01.2015."— Presentation transcript:

1 Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR

2 ESSIP Plan 2015 / Objective ITY-AGVCS2L
Explanation What is new or has changed since previous ESSIP edition Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2014 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts ESSIP Plan 2015 / Objective ITY-AGVCS2L

3 ESSIP Plan 2015 / Objective ITY-AGVCS2
Explanation The objective is based in Regulation (EU) No 1079/2012 and mandates: the conversion of all* 25 kHz frequency assignments to 8,33 kHz by 12/2018 all* radios and voice communication systems need to be 8,33 kHz-capable by 12/2017 * There are multiple exemptions and derogations and specific requirements for State aircraft (see field ‘Derogations’ for each SLoA) The objective complements previous ITY-AGVCS which covered the requirements above FL195, this objective extends the mandate down to the ground. Applicable to EU+ States ESSIP Plan 2015 / Objective ITY-AGVCS2

4 What is new or has changed since previous ESSIP edition
n/a ESSIP Plan 2015 / Objective ITY-AGVCS2

5 Link to European ATM Master Plan
[CTE-C5]- 8,33 kHz Voice communications Air-Ground: VHF 8.33 kHz is mandated in all continental airspace to support increases in traffic. ESSIP Plan 2015 / Objective ITY-AGVCS2

6 Most important SLoA(s)
N/A (all) ESSIP Plan 2015 / Objective ITY-AGVCS2

7 Finalisation Criteria and Closed Questions
N/A (See objective description) No additional closed questions other than the established finalisation criteria ESSIP Plan 2015 / Objective ITY-AGVCS2

8 ESSIP Plan 2015 / Objective ITY-AGVCS2
Supporting Material As specified in SLoAs detailed descriptions ESSIP Plan 2015 / Objective ITY-AGVCS2

9 ESSIP Plan 2015 / Objective ITY-AGVCS2
ESSIP Report 2014 ESSIP Plan 2015 / Objective ITY-AGVCS2

10 Objective Coordinator’s Analysis, recommendations, tips & tricks
Read carefully the SLoAs’ definitions and derogations Note that there are many instances where notifications to the European Commission are required Ensure coordination with your national representative in the 8,33 Implementation Sub-Group ESSIP Plan 2015 / Objective ITY-AGVCS2

11 ESSIP Plan 2015 / Objective ITY-AGVCS2
Conclusions N/A ESSIP Plan 2015 / Objective ITY-AGVCS2

12 ESSIP Plan 2015 / Objective ITY-AGVCS2
Conclusions Objective Coordinator: Oscar ALFARO; EUROCONTROL Objective Expert(s): Bogdan Petricel ESSIP Plan 2015 / Objective ITY-AGVCS2


Download ppt "Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR 01.01.2015."

Similar presentations


Ads by Google