Download presentation
Presentation is loading. Please wait.
1
Musselwhite, Placer Dome
42” 600 mtph, 2 Flights 2 x 600 hp 1 x 500 hp
2
CV-102 GENERAL ARRANGEMENT
3
CV-103 GENERAL ARRANEMENT
4
Head end drive station details
5
Lateral bracing method using rock bolts & coupler
6
Musslewhite Suspension adjustment turnbuckles
CV-0002 & CV-003 at the transfer station Suspension adjustment turnbuckles
7
CV-103 EMERGING FROM ADDIT
8
CV-103 ADDIT
9
CV-003 Head End CV-003 Drive
10
Elevated truss section of CV-003
CV-003 take up tower at side of drive house
11
CV-103 LOOKING TOWARD HEAD END
12
CV-103 HEAD END
13
CV 003 (Stacker) Elevated Truss and Supports.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.