Download presentation
Presentation is loading. Please wait.
1
Feedback received on 802.11 Revision PAR
November 2008 doc.: IEEE /1373r0 November 2008 Feedback received on Revision PAR Date: Authors: Jon Rosdahl, CSR Jon Rosdahl, CSR
2
November 2008 doc.: IEEE /1373r0 November 2008 Abstract This document contains the comments received and the recommended resolutions for the Revision PAR submission to 802 EC. Jon Rosdahl, CSR Jon Rosdahl, CSR
3
Feedback Received on 802.11 Revision PAR From Paul Nikolich
November 2008 Feedback Received on Revision PAR From Paul Nikolich Please list the approved amendments that are anticipated to be rolled up into the documents as part of the revision in 5.5 Need for Project part of the PAR form. A simple list of the numbers would be sufficient (i.e., the entire titles aren't necessary). Jon Rosdahl, CSR
4
Proposed Response to Feedback
November 2008 Proposed Response to Feedback Add a new sentence in 5.5 need for Project clause: “The approved amendments as of the filing of the revision PAR include k, r, and y amendments.” Jon Rosdahl, CSR
5
November 2008 5.5 Need for the Project: The reason for this project is to incorporate accumulated maintenance changes (editorial and technical corrections) into , and roll up the approved amendments to the standard. The approved amendments as of the filing of the revision PAR include k, r, and y amendments. Jon Rosdahl, CSR
6
Motion to accept Proposed Response
November 2008 Motion to accept Proposed Response TGmb Motion: Accept the proposed response contained in 08/1373r0 slide 4. Moved: Jon Rosdahl 2nd Jon Rosdahl, CSR
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.